DRRRP · Sri Lanka
Project Monitoring Dashboard
Comprehensive overview of 37 infrastructure projects
under the Disaster Rebuild and Rural Road Project — Sri Lanka.
Updated 2026-11-02 10:30Live
Graphs reflect current view:37 awarded · Central Province · Kandy
88.1% awarded
0
Awarded
42 total projects 42 roads in portfolio
Awarded projects37
RR/RDA/04/25/13/CP/KYGonaala Pasala Asala Sita Kubukkadura Athuru Margayak Wana Gurumada MargayaRR/RDA/04/25/15/CP/KYMadolkale sita Huluganga dakwa yana athuru margaye Bandaranayakapura gam kotasata adala MargayaRR/RDA/04/25/17/CP/KYNuganga MargayaRR/RDA/04/25/19/CP/KYMulgama viduhala Asala sita lewalan dakwaRR/RDA/04/25/20/CP/KYCarpeting road Ratemulla to Wendesiwaththa EndRR/RDA/04/25/21/CP/KYGalaha group sita finas kotasa Pahalagama-Ihalagama haraha nawa rohala dakwa MargayaRR/RDA/04/25/22/CP/KYRambukwella viharasthanaya asala sita Dodamgolla Rambukwella nagenhira haraha Udispaththuwa dakwa diwena MargayaRR/RDA/04/25/23/CP/KYMinuwangamuwa gammada margaye Aberathne mahathage niwasa asala sita Abesinha Banda mahathage Niwasa dakwaRR/RDA/04/25/24/CP/KYGalamuduna gamata pivisena MargayaRR/RDA/04/25/25/CP/KYDelgasthenna RoadRR/RDA/04/25/27/CP/KYDadahogama pitiye gedara pathibami sahitha MargayaRR/RDA/04/25/28/CP/KYDehideniya sita Hedeniya dakwa MargayaRR/RDA/04/25/31/CP/KYShantha Janapada Village middle roadRR/RDA/04/25/31(1)/CP/KYPaththunupitiya School road to Gampola Road through Pallegama Anguruwala
+23 more…
Click to filter the awarded table
1,244.4M
1,244.4 Mn
Contract Value
Awarded projects37
RR/RDA/04/25/13/CP/KYGonaala Pasala Asala Sita Kubukkadura Athuru Margayak Wana Gurumada MargayaRR/RDA/04/25/15/CP/KYMadolkale sita Huluganga dakwa yana athuru margaye Bandaranayakapura gam kotasata adala MargayaRR/RDA/04/25/17/CP/KYNuganga MargayaRR/RDA/04/25/19/CP/KYMulgama viduhala Asala sita lewalan dakwaRR/RDA/04/25/20/CP/KYCarpeting road Ratemulla to Wendesiwaththa EndRR/RDA/04/25/21/CP/KYGalaha group sita finas kotasa Pahalagama-Ihalagama haraha nawa rohala dakwa MargayaRR/RDA/04/25/22/CP/KYRambukwella viharasthanaya asala sita Dodamgolla Rambukwella nagenhira haraha Udispaththuwa dakwa diwena MargayaRR/RDA/04/25/23/CP/KYMinuwangamuwa gammada margaye Aberathne mahathage niwasa asala sita Abesinha Banda mahathage Niwasa dakwaRR/RDA/04/25/24/CP/KYGalamuduna gamata pivisena MargayaRR/RDA/04/25/25/CP/KYDelgasthenna RoadRR/RDA/04/25/27/CP/KYDadahogama pitiye gedara pathibami sahitha MargayaRR/RDA/04/25/28/CP/KYDehideniya sita Hedeniya dakwa MargayaRR/RDA/04/25/31/CP/KYShantha Janapada Village middle roadRR/RDA/04/25/31(1)/CP/KYPaththunupitiya School road to Gampola Road through Pallegama Anguruwala
+23 more…
Click to filter the awarded table
Avg
78.2%
13
works in progress
22 completed
Avg Progress
Awarded projects37
RR/RDA/04/25/13/CP/KYGonaala Pasala Asala Sita Kubukkadura Athuru Margayak Wana Gurumada MargayaRR/RDA/04/25/15/CP/KYMadolkale sita Huluganga dakwa yana athuru margaye Bandaranayakapura gam kotasata adala MargayaRR/RDA/04/25/17/CP/KYNuganga MargayaRR/RDA/04/25/19/CP/KYMulgama viduhala Asala sita lewalan dakwaRR/RDA/04/25/20/CP/KYCarpeting road Ratemulla to Wendesiwaththa EndRR/RDA/04/25/21/CP/KYGalaha group sita finas kotasa Pahalagama-Ihalagama haraha nawa rohala dakwa MargayaRR/RDA/04/25/22/CP/KYRambukwella viharasthanaya asala sita Dodamgolla Rambukwella nagenhira haraha Udispaththuwa dakwa diwena MargayaRR/RDA/04/25/23/CP/KYMinuwangamuwa gammada margaye Aberathne mahathage niwasa asala sita Abesinha Banda mahathage Niwasa dakwaRR/RDA/04/25/24/CP/KYGalamuduna gamata pivisena MargayaRR/RDA/04/25/25/CP/KYDelgasthenna RoadRR/RDA/04/25/27/CP/KYDadahogama pitiye gedara pathibami sahitha MargayaRR/RDA/04/25/28/CP/KYDehideniya sita Hedeniya dakwa MargayaRR/RDA/04/25/31/CP/KYShantha Janapada Village middle roadRR/RDA/04/25/31(1)/CP/KYPaththunupitiya School road to Gampola Road through Pallegama Anguruwala
+23 more…
Click to filter the awarded table
414.1M
414.1 Mn
Total Expenditure (incl. VAT)
Awarded projects37
RR/RDA/04/25/13/CP/KYGonaala Pasala Asala Sita Kubukkadura Athuru Margayak Wana Gurumada MargayaRR/RDA/04/25/15/CP/KYMadolkale sita Huluganga dakwa yana athuru margaye Bandaranayakapura gam kotasata adala MargayaRR/RDA/04/25/17/CP/KYNuganga MargayaRR/RDA/04/25/19/CP/KYMulgama viduhala Asala sita lewalan dakwaRR/RDA/04/25/20/CP/KYCarpeting road Ratemulla to Wendesiwaththa EndRR/RDA/04/25/21/CP/KYGalaha group sita finas kotasa Pahalagama-Ihalagama haraha nawa rohala dakwa MargayaRR/RDA/04/25/22/CP/KYRambukwella viharasthanaya asala sita Dodamgolla Rambukwella nagenhira haraha Udispaththuwa dakwa diwena MargayaRR/RDA/04/25/23/CP/KYMinuwangamuwa gammada margaye Aberathne mahathage niwasa asala sita Abesinha Banda mahathage Niwasa dakwaRR/RDA/04/25/24/CP/KYGalamuduna gamata pivisena MargayaRR/RDA/04/25/25/CP/KYDelgasthenna RoadRR/RDA/04/25/27/CP/KYDadahogama pitiye gedara pathibami sahitha MargayaRR/RDA/04/25/28/CP/KYDehideniya sita Hedeniya dakwa MargayaRR/RDA/04/25/31/CP/KYShantha Janapada Village middle roadRR/RDA/04/25/31(1)/CP/KYPaththunupitiya School road to Gampola Road through Pallegama Anguruwala
+23 more…
Click to filter the awarded table
64.9%
0
On Progress
24 / 37 awarded
On Progress (incl. completed)24
RR/RDA/04/25/15/CP/KYMadolkale sita Huluganga dakwa yana athuru margaye Bandaranayakapura gam kotasata adala MargayaRR/RDA/04/25/17/CP/KYNuganga MargayaRR/RDA/04/25/22/CP/KYRambukwella viharasthanaya asala sita Dodamgolla Rambukwella nagenhira haraha Udispaththuwa dakwa diwena MargayaRR/RDA/04/25/23/CP/KYMinuwangamuwa gammada margaye Aberathne mahathage niwasa asala sita Abesinha Banda mahathage Niwasa dakwaRR/RDA/04/25/27/CP/KYDadahogama pitiye gedara pathibami sahitha MargayaRR/RDA/04/25/31/CP/KYShantha Janapada Village middle roadRR/RDA/04/25/32/CP/KYPilawala Navodya pasala asala sita Nelumpathhinna pansala dakwa margayaRR/RDA/04/25/33/CP/KYNew forest kotase Jana Udana gammana margayaRR/RDA/04/25/34/CP/KYLiyandeniya wewa margyaRR/RDA/04/25/35/CP/KYGamunupura Gonawatta pradana margaye Gamunupura pera pasala asala sita idiriyata pradana margayaRR/RDA/04/25/43/CP/KYDodamgolla kowila asla sita hindu susana boomiya dakwa margayaRR/RDA/04/25/53/CP/KYRoad from Amuvandeniya to Magurudeniya (development of the drainage and carpeting of the road)RR/RDA/04/25/42Mahanuwara Digana pradana margaye gamudawa jala tankiya asala sita Malgahamula handiya dakwa MargayaRR/RDA/04/25/45Seewalee Kande sits Mahthanna Samadi Senasuna dakwa divena margayaRR/RDA/04/25/18Dewaraja Mw (Balance Work)
+9 more…
Click to filter the awarded table
0%
0
Delay
0 / 37 awarded
Delay0
No projects
Click to filter the awarded table
35.1%
0
Critical Delay
13 / 37 awarded
Critical Delay13
RR/RDA/04/25/13/CP/KYGonaala Pasala Asala Sita Kubukkadura Athuru Margayak Wana Gurumada MargayaRR/RDA/04/25/19/CP/KYMulgama viduhala Asala sita lewalan dakwaRR/RDA/04/25/20/CP/KYCarpeting road Ratemulla to Wendesiwaththa EndRR/RDA/04/25/21/CP/KYGalaha group sita finas kotasa Pahalagama-Ihalagama haraha nawa rohala dakwa MargayaRR/RDA/04/25/24/CP/KYGalamuduna gamata pivisena MargayaRR/RDA/04/25/25/CP/KYDelgasthenna RoadRR/RDA/04/25/28/CP/KYDehideniya sita Hedeniya dakwa MargayaRR/RDA/04/25/31(1)/CP/KYPaththunupitiya School road to Gampola Road through Pallegama AnguruwalaRR/RDA/04/25/41/CP/KYKaryala handiya pahala margya concrete kirimaRR/RDA/04/25/52/CP/KYBokalawela Road from Hapugoda Junction to Ranawana (Drinage System Development and Road)
+3 more…
Click to filter the awarded table
59.5%
0
Completed
22 / 37 awarded
Completed22
RR/RDA/04/25/15/CP/KYMadolkale sita Huluganga dakwa yana athuru margaye Bandaranayakapura gam kotasata adala MargayaRR/RDA/04/25/17/CP/KYNuganga MargayaRR/RDA/04/25/22/CP/KYRambukwella viharasthanaya asala sita Dodamgolla Rambukwella nagenhira haraha Udispaththuwa dakwa diwena MargayaRR/RDA/04/25/23/CP/KYMinuwangamuwa gammada margaye Aberathne mahathage niwasa asala sita Abesinha Banda mahathage Niwasa dakwaRR/RDA/04/25/27/CP/KYDadahogama pitiye gedara pathibami sahitha MargayaRR/RDA/04/25/31/CP/KYShantha Janapada Village middle roadRR/RDA/04/25/32/CP/KYPilawala Navodya pasala asala sita Nelumpathhinna pansala dakwa margayaRR/RDA/04/25/33/CP/KYNew forest kotase Jana Udana gammana margayaRR/RDA/04/25/34/CP/KYLiyandeniya wewa margyaRR/RDA/04/25/35/CP/KYGamunupura Gonawatta pradana margaye Gamunupura pera pasala asala sita idiriyata pradana margayaRR/RDA/04/25/43/CP/KYDodamgolla kowila asla sita hindu susana boomiya dakwa margayaRR/RDA/04/25/42Mahanuwara Digana pradana margaye gamudawa jala tankiya asala sita Malgahamula handiya dakwa MargayaRR/RDA/04/25/45Seewalee Kande sits Mahthanna Samadi Senasuna dakwa divena margayaRR/RDA/04/25/18Dewaraja Mw (Balance Work)
+8 more…
Click to filter the awarded table
Portfolio Breakdown · Central Province · Kandy · District
Avg Physical Progress per EE Division · Central Province · Kandy
At-Risk Projects · Central Province · Kandy
- RR/RDA/04/25/21/CP/KYGalaha group sita finas kotasa Pahalagama-Ihalagama haraha nawa rohala dakwa MargayaDelay308 Days in Delay · 80%
- RR/RDA/04/25/19/CP/KYMulgama viduhala Asala sita lewalan dakwaDelay294 Days in Delay · 35%
- RR/RDA/04/25/41/CP/KYKaryala handiya pahala margya concrete kirimaDelay294 Days in Delay · 85%
- RR/RDA/04/25/28/CP/KYDehideniya sita Hedeniya dakwa MargayaDelay285 Days in Delay · 35%
- RR/RDA/04/25/20/CP/KYCarpeting road Ratemulla to Wendesiwaththa EndDelay272 Days in Delay · 45%
- RR/RDA/04/25/25/CP/KYDelgasthenna RoadDelay182 Days in Delay · 0%
- RR/RDA/04/25/31(1)/CP/KYPaththunupitiya School road to Gampola Road through Pallegama AnguruwalaDelay120 Days in Delay · 30%
- Development of entrance roads, pedestrian rest areas and parking areas of the Sri Dalada Maligawa premisesDelay89 Days in Delay · 40%
- RR/RDA/04/25/13/CP/KYGonaala Pasala Asala Sita Kubukkadura Athuru Margayak Wana Gurumada MargayaDelay75 Days in Delay · 37%
- RR/RDA/04/25/52/CP/KYBokalawela Road from Hapugoda Junction to Ranawana (Drinage System Development and Road)Delay74 Days in Delay · 60%
- RR/RDA/04/25/53/CP/KYRoad from Amuvandeniya to Magurudeniya (development of the drainage and carpeting of the road)Delay57 Days in Delay · 40%
- Development of the Dolapihilla road from Navinnapitiya via DeldeniyaDelay30 Days in Delay · 20%
Portfolio Timeline· 37 scheduled projects · Central Province · Kandy Toggle
2025-06-21 today2026-11-20
Portfolio · Awarded Works
Awarded Projects
37 projects
Filter awarded works
37 matching projects
| # | Contract No. | Package No. | Contract Name | Progress | LOA Amount | Estimate Amount | Status |
|---|---|---|---|---|---|---|---|
| 1 | RR/RDA/04/25/13/CP/KY | RR/RDA/04/25/13 | Gonaala Pasala Asala Sita Kubukkadura Athuru Margayak Wana Gurumada Margaya | 37% | 35,195,820.00 | 42,644,514.03 | Awarded |
| 2 | RR/RDA/04/25/15/CP/KY | RR/RDA/04/25/15 | Madolkale sita Huluganga dakwa yana athuru margaye Bandaranayakapura gam kotasata adala Margaya | 100% | 12,711,509.59 | 20,856,501.79 | Awarded |
| 3 | RR/RDA/04/25/16 | Palawa ihala meda Wijitha mawatha Waliyangadeniya margaya yakarana athuru Margaya | 100% | 12,240,493.10 | 16,221,430.00 | Awarded | |
| 4 | RR/RDA/04/25/17/CP/KY | RR/RDA/04/25/17 | Nuganga Margaya | 100% | 9,650,635.50 | 15,455,845.00 | Awarded |
| 5 | RR/RDA/04/25/19/CP/KY | RR/RDA/04/25/19 | Mulgama viduhala Asala sita lewalan dakwa | 35% | 25,917,512.50 | 46,131,296.30 | Awarded |
| 6 | RR/RDA/04/25/20/CP/KY | RR/RDA/04/25/20 | Carpeting road Ratemulla to Wendesiwaththa End | 45% | 36,995,817.10 | 40,119,276.86 | Awarded |
| 7 | RR/RDA/04/25/21/CP/KY | RR/RDA/04/25/21 | Galaha group sita finas kotasa Pahalagama-Ihalagama haraha nawa rohala dakwa Margaya | 80% | 22,711,029.00 | 40,719,533.36 | Awarded |
| 8 | RR/RDA/04/25/22/CP/KY | RR/RDA/04/25/22 | Rambukwella viharasthanaya asala sita Dodamgolla Rambukwella nagenhira haraha Udispaththuwa dakwa diwena Margaya | 100% | 15,056,107.00 | 26,802,449.26 | Awarded |
| 9 | RR/RDA/04/25/23/CP/KY | RR/RDA/04/25/23 | Minuwangamuwa gammada margaye Aberathne mahathage niwasa asala sita Abesinha Banda mahathage Niwasa dakwa | 100% | 27,734,432.55 | 49,079,937.23 | Awarded |
| 10 | RR/RDA/04/25/24/CP/KY | RR/RDA/04/25/24 | Galamuduna gamata pivisena Margaya | 0% | 157,638,978.90 | 201,921,834.86 | Awarded |
| 11 | RR/RDA/04/25/25/CP/KY | RR/RDA/04/25/25 | Delgasthenna Road | 0% | 56,035,922.24 | 78,736,509.47 | Awarded |
| 12 | RR/RDA/04/25/27/CP/KY | RR/RDA/04/25/27 | Dadahogama pitiye gedara pathibami sahitha Margaya | 100% | 12,532,355.00 | 14,990,258.08 | Awarded |
| 13 | RR/RDA/04/25/28/CP/KY | RR/RDA/04/25/28 | Dehideniya sita Hedeniya dakwa Margaya | 35% | 38,495,776.00 | 41,827,394.04 | Awarded |
| 14 | RR/RDA/04/25/31/CP/KY | RR/RDA/04/25/31 | Shantha Janapada Village middle road | 100% | 42,357,645.00 | 47,278,636.42 | Awarded |
| 15 | RR/RDA/04/25/31(1)/CP/KY | RR/RDA/04/25/31(1) | Paththunupitiya School road to Gampola Road through Pallegama Anguruwala | 30% | 50,476,865.28 | 65,989,182.36 | Awarded |
| 16 | RR/RDA/04/25/32/CP/KY | RR/RDA/04/25/32 | Pilawala Navodya pasala asala sita Nelumpathhinna pansala dakwa margaya | 100% | 18,059,531.27 | 19,939,938.98 | Awarded |
| 17 | RR/RDA/04/25/33/CP/KY | RR/RDA/04/25/33 | New forest kotase Jana Udana gammana margaya | 100% | 6,992,144.50 | 12,512,939.76 | Awarded |
| 18 | RR/RDA/04/25/34/CP/KY | RR/RDA/04/25/34 | Liyandeniya wewa margya | 100% | 9,134,433.00 | 11,711,039.23 | Awarded |
| 19 | RR/RDA/04/25/35/CP/KY | RR/RDA/04/25/35 | Gamunupura Gonawatta pradana margaye Gamunupura pera pasala asala sita idiriyata pradana margaya | 100% | 30,043,716.01 | 34,175,878.49 | Awarded |
| 20 | RR/RDA/04/25/41/CP/KY | RR/RDA/04/25/41 | Karyala handiya pahala margya concrete kirima | 85% | 22,047,564.00 | 39,022,781.94 | Awarded |
| 21 | RR/RDA/04/25/43/CP/KY | RR/RDA/04/25/43 | Dodamgolla kowila asla sita hindu susana boomiya dakwa margaya | 100% | 14,680,539.50 | 26,797,465.46 | Awarded |
| 22 | RR/RDA/04/25/50 | Ambakote Road | 5% | 32,019,889.00 | 31,070,808.88 | Awarded | |
| 23 | RR/RDA/04/25/52/CP/KY | RR/RDA/04/25/52 | Bokalawela Road from Hapugoda Junction to Ranawana (Drinage System Development and Road) | 60% | 50,478,905.00 | 72,631,674.77 | Awarded |
| 24 | RR/RDA/04/25/53/CP/KY | RR/RDA/04/25/53 | Road from Amuvandeniya to Magurudeniya (development of the drainage and carpeting of the road) | 40% | 29,850,460.20 | 39,182,935.51 | Awarded |
| 25 | RR/RDA/04/25/54 | Development of the Dolapihilla road from Navinnapitiya via Deldeniya | 20% | 65,808,186.50 | 73,819,405.52 | Awarded |
Showing 1–25 of 37
Source: DRRRP • 42 projects • Data updated 2026-11-02 10:30 • 14:35:05 System live • Sri Lanka • 1 districts