266 matching projects
| # | Contract No. | Serial No. | Tender Batch No. | Contract Name | Road Name | Chainage | Scope | Description | Province | District | EE Division | Package No. | Contractor | Status | Tender By | LOA Date | Contract Amount | Estimate Amount | Project Duration (Days) | Num Roads | Structures | Est. Lengths | Planned Work Start | Planned Work Finish | Possession of Site | Physical Progress % | Planned Progress % | Financial Progress % | Financial Progress (Mn) | Planned Financial (Mn) | IPC/Advance Pending (Mn) | Mobilization % | Surveying % | Site Clearing % | Base Construction % | Asphalt % | Structure % | Drainage % | Advance Requested | Advance Paid (w/o VAT) | Advance Pending (w/o VAT) | IPCs Paid (w/o VAT) | IPCs Pending (w/o VAT) | LOA Issued | Agreement | Account Open | Advance Paid | Kick Off | Mobilized to Site | In Progress | Perf Bond | Adv Bond | Insurance | Contract Doc | Source Approval | Drawings | Staff Details | Work Programme | Traffic Plan | Critical Issues |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | RDA/DRP/CEN/KDY/KAD/11 | 33 | 3 | Rehabilitation / Improvement of Nawalapitiya - Dolosbage Road ( B -318) ( 10+500 - 19+350 ), Dedugala Dolosbage Road ( B -588) ( 10+100 - 12+410 ) | Nawalapitiya - Dolosbage Road ( B -318) ( 10+500 - 19+350 ), Dedugala Dolosbage Road ( B -588) ( 10+100 - 12+410 ) | (B-318) ( 10+500 - 19+350 ), (B-588) ( 10+100 - 12+410 ) | Construction of culverts, drain, Retaining structure,Base correction, Asphalt, safety Hand rails. | Rehabilitation / Improvement of Nawalapitiya - Dolosbage Road ( B -318) ( 10+500 - 19+350 ), Dedugala Dolosbage Road ( B -588) ( 10+100 - 12+410 ) | Central Province | Kandy | Kadugannawa | 4 | Tiasa Construction (Pvt) Ltd | Awarded | ”” | 2026-03-17 | 193,404,194.96 | 275,515,701.42 | 182 | ”” | ”” | 0.00 | 2026-03-25 | 2026-09-23 | 2026-03-25 | 26.5% | 100% | 30.1% | 58.18 | 193.40 | 0.00 | 100% | 45% | 100% | 0% | 0% | 10% | 10% | Yes | 33,346,525.54 | 0.00 | 15,954,390.29 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | No | No | — | — | — | ”” |
| 2 | RDA/DRP/CEN/KDY/KAN/14 | ”” | ”” | Rehabilitation /Improvement of Katugasthota Medawala road ( B 0206)( 0 + 000 - 9+370) | Katugasthota Medawala road ( B 0206)( 0 + 000 - 9+370) | 0+000 - 9+370 | Construction of Retaining structures, Construction of culverts, | Rehabilitation /Improvement of Katugasthota Medawala road ( B 0206)( 0 + 000 - 9+370) | Central Province | Kandy | Kandy | 2 | Alucon Industries (Pvt) Ltd | Awarded | ”” | 2026-08-14 | 74,836,014.77 | 72,827,654.90 | 182 | 0 | ”” | 0.00 | 2026-09-01 | 2027-03-01 | 2026-09-01 | 9% | 24.9% | 0% | 0.00 | 18.63 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | Yes | Yes | Yes | — | — | — | — | — | — | — | — | — | ”” |
| 3 | RDA/DRP/CEN/KDY/KDY/15 | ”” | ”” | Rehabilitation / Improvement of Galagedara Rambukkana ( B 122) ( 0+000 - 18+000) | Galagedara Rambukkana ( B 122) ( 0+000 - 18+000) | ( 0+000 - 18+000) | Construction of Retaining structures, Construction of Gabian wall | Rehabilitation / Improvement of Galagedara Rambukkana ( B 122) ( 0+000 - 18+000) | Central Province | Kandy | Kandy | 3 | Jayawansa Construction (Pvt) Ltd | Awarded | ”” | 2026-08-14 | 79,071,437.68 | 79,953,569.86 | 182 | 0 | ”” | 0.00 | 2026-09-09 | 2027-03-09 | 2026-09-10 | 6% | 18.9% | 0% | 0.00 | 14.94 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | Yes | Yes | Yes | — | — | — | — | — | — | — | — | — | ”” |
| 4 | RDA/DRP/CEN/KDY/KDY/19 | ”” | ”” | Rehabilitation / Improvement of Poojapitiya Alawathugoda road ( B 377) ( 0+000 - 8+000) | Poojapitiya Alawathugoda road ( B 377) ( 0+000 - 8+000) | 0+000 -8+000 | Construction of Retaining Structures | Rehabilitation / Improvement of Poojapitiya Alawathugoda road ( B 377) ( 0+000 - 8+000) | Central Province | Kandy | Kandy | 7 | Jayawansa Construction (Pvt) Ltd | Awarded | ”” | 2026-09-14 | 67,935,586.77 | 64,393,315.70 | 182 | 0 | ”” | 0.00 | 2026-09-17 | 2027-03-18 | 2026-09-14 | 5% | 13.9% | 0% | 0.00 | 9.44 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | Yes | Yes | Yes | — | — | — | — | — | — | — | — | — | ”” |
| 5 | RDA/DRP/CEN/KDY/KUN/20 | 132 | ”” | Rehabilitation / Improvement to Structures on Madolkelle - Kabaragala - Kandenuwara Road (B 257) (4+000 - 8+000) | Rehabilitation / Improvement to Structures on Madolkelle - Kabaragala - Kandenuwara Road (B 257) (4+000 - 8+000) | 4+000 - 8+000 | Construction of Retaining wall and Gabion wall | Rehabilitation / Improvement to Structures on Madolkelle - Kabaragala - Kandenuwara Road (B 257) (4+000 - 8+000) | Central Province | Kandy | Kundasale | 1 | Samindra Construction | Awarded | ”” | 2026-07-06 | 31,558,227.98 | 28,660,618.70 | 119 | 0 | ”” | 0.00 | 2026-07-20 | 2026-11-15 | 2026-07-20 | 53% | 93.1% | 0% | 0.00 | 29.98 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | — | No | Yes | Yes | Yes | — | — | — | — | — | — | — | — | — | ”” |
| 6 | RDA/DRP/CEN/KDY/KUN/21 | 44 | 4 | Improvement of Pitiyegedara-Waththegama-Iriyagasthenna Road (0+000-5+400) | Pitiyegedara-Waththegama-Iriyagasthenna Road (B369) | (0+000-5+400) | Surface Overlaying and Culvert Construction | Improvement of Pitiyegedara-Waththegama-Iriyagasthenna Road (0+000-5+400) | Central Province | Kandy | Kundasale | 2 | Jayasinghe Construction (Pvt) Ltd | Awarded | ”” | 2026-03-12 | 257,721,453.96 | 314,486,807.16 | 182 | 0 | ”” | 0.00 | 2026-04-30 | 2026-10-28 | 2026-04-30 | 12% | 100% | 21.2% | 54.55 | 257.72 | 10.01 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | Yes | 46,231,491.42 | 0.00 | 0.00 | 8,483,606.80 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | Yes | — | — | — | — | ”” |
| 7 | RDA/DRP/CEN/KDY/KUN/22 | 43 | 4 | Improvement to Damaged Road Section on Weeragantota - Randenigala Road. (From CH 19+000 To CH 27+200) | Weraganthota-Randenigala Road (B474) | (19+000-27+0000) | Gabion Wall Construction and Asphlt Overlaying | Improvement to Damaged Road Section on Weeragantota - Randenigala Road. (From CH 19+000 To CH 27+200) | Central Province | Kandy | Kundasale | 3 | SD Civil Construction (Pvt) Ltd | Awarded | ”” | 2026-03-12 | 224,968,435.78 | 333,005,906.52 | 182 | 0 | ”” | 0.00 | 2026-03-25 | 2026-09-23 | 2026-05-25 | 67% | 100% | 39.3% | 88.42 | 224.97 | 0.00 | 100% | 100% | 100% | 0% | 0% | 28% | 0% | Yes | 40,192,882.63 | 0.00 | 34,738,972.19 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 8 | RDA/DRP/CEN/KDY/KUN/24R | 133 | 12 | Rehabilitation / Improvement of Flood damage on Katugastota - Madawala - Bamberella Road (B205) (0-000 - 7+200 and 13+000 - 13+045) | Katugastota Madawala Bamberella Road | 0-000 - 7+200 and 13+000 - 13+045 | Flood damage Katugastota Madawala Bamberella | Rehabilitation / Improvement of Flood damage on Katugastota - Madawala - Bamberella Road (B205) (0-000 - 7+200 and 13+000 - 13+045) | Central Province | Kandy | Kundasale | 5 | Nimsara Construction & Engineering (Pvt) Ltd | Awarded | ”” | 2026-08-31 | 79,507,501.11 | 80,438,429.85 | 182 | 0 | ”” | 0.00 | 2026-09-14 | 2027-03-14 | 2026-09-11 | 5% | 15.7% | 0% | 0.00 | 12.48 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | Yes | Yes | Yes | — | — | — | — | — | — | — | — | — | ”” |
| 9 | RDA/DRP/CEN/KDY/KUN/25 | 134 | 12 | Construction of Gabion Retaining Wall on Katugastota Madawala Bamberella Road(LHS 9+600 - 9+655), (15+450 - 15+500), (10+235 - 10+300) and Wattegama Matale road (0+400 - 0+435) | Katugastota - Madawala - Bamberella Road | (LHS 9+600 - 9+655), (15+450 - 15+500), (10+235 - 10+300) and (0+400 - 0+435) | Construction of Gabion Retaining Wall | Construction of Gabion Retaining Wall on Katugastota Madawala Bamberella Road(LHS 9+600 - 9+655), (15+450 - 15+500), (10+235 - 10+300) and Wattegama Matale road (0+400 - 0+435) | Central Province | Kandy | Kundasale | 6 | S N O Builders (Pvt) Ltd | Awarded | ”” | 2026-06-16 | 157,909,825.01 | 178,738,774.63 | 119 | 0 | ”” | 0.00 | 2026-07-06 | 2026-11-01 | 2026-07-06 | 59% | 100% | 40.5% | 63.95 | 157.91 | 11.04 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | Yes | 28,346,587.80 | 0.00 | 25,922,264.54 | 10,705,591.47 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 10 | RDA/DRP/CEN/KDY/KUN/26R | 135 | 12 | Improvement to Structures on Kandy - Jaffna Road 11+700 - 11+850 | Kandy - Jaffna Road | 11+700 - 11+850 | Construction of Gabion Wall | Improvement to Structures on Kandy - Jaffna Road 11+700 - 11+850 | Central Province | Kandy | Kundasale | 7 | SD Civil Construction (Pvt) Ltd | Awarded | ”” | 2026-09-21 | 148,430,322.65 | 140,123,428.78 | 126 | 0 | ”” | 0.00 | — | — | — | 0% | 0% | 0% | 0.00 | 0.00 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 11 | RDA/DRP/CEN/KDY/KUN/27 | 136 | 12 | Improvement to Structures on Kandy - Jaffna Road 6+500 - 9+910 | Kandy - Jaffna Road | 6+500 - 9+910 | Construction of Gabion Wall | Improvement to Structures on Kandy - Jaffna Road 6+500 - 9+910 | Central Province | Kandy | Kundasale | 8 | Gihan Enterprise | Awarded | ”” | 2026-06-16 | 113,434,139.40 | 122,896,558.88 | 119 | 0 | ”” | 0.00 | 2026-06-30 | 2026-10-27 | 2026-06-30 | 66% | 100% | 24% | 27.21 | 113.43 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | Yes | 20,128,022.37 | 0.00 | 2,934,355.86 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 12 | RDA/DRP/CEN/KDY/KUN/29 | 137 | 12 | Improvement to Structures on Kandy - Mahiyanganaya - Padiyaththalawa Road (24+000-71+500) and Moragahamula victoria damtop | Kandy - Mahiyanganaya - Padiyaththalawa Road (24+000-71+500) A026 and Moragahamula victoria damtop B493 | (24+000-71+500) and 0+000 - 8+400 | Construction of Retaining Walls, "U" Drain and Shoulder Construction | Improvement to Structures on Kandy - Mahiyanganaya - Padiyaththalawa Road (24+000-71+500) and Moragahamula victoria damtop | Central Province | Kandy | Kundasale | 10 | S N O Builders (Pvt) Ltd | Awarded | ”” | 2026-06-16 | 91,559,621.04 | 100,543,979.99 | 182 | 0 | ”” | 0.00 | 2026-07-06 | 2027-01-03 | 2026-07-06 | 61% | 78.9% | 40.7% | 37.29 | 72.24 | 12.87 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | Yes | 16,157,282.84 | 0.00 | 15,442,292.28 | 10,906,899.22 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 13 | RDA/DRP/CEN/MTL/MTL/31R | 105 | 9 | Rehabilitation / Improvement of Matale - Udupihilla Road (AB026) (0+000 - 6+000) | Matale Udupihilla Road (AB 026) | 0+000 to 6+000 | Construction of Drainage structutres | Rehabilitation / Improvement of Matale - Udupihilla Road (AB026) (0+000 - 6+000) | Central Province | Matale | Matale | 1 | Alucon Industries (Pvt) Ltd | Awarded | ”” | 2026-08-14 | 63,704,849.78 | 0.00 | 91 | 0 | ”” | 0.00 | 2026-09-01 | 2026-11-30 | 2026-09-05 | 7.5% | 75.6% | 0% | 0.00 | 48.16 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | Yes | Yes | Yes | — | — | — | — | — | — | — | — | — | ”” |
| 14 | RDA/DRP/CEN/MTL/MTL/32 | 36 | 3 | Rehabilitation / Improvement of Kandy Jaffna (A-009)(17+710 - 46+450), Thalgodapitiya - Yatawatta - Dombawela (B-409) (15+030 - 26+800), Palapathwela - Galewela Road B-346)(0+000 - 8+100) Roads | Kandy Jaffna Road A 009 (17+710 - 46+450), Thalgodapitiya Yatawatta Dombawela road B 409 (15+030 - 26+800),Palapathwela Galewela road B 346 (0+000 - 8+100) | (17+710 - 46+450), (15+030 - 26+800), (0+000 - 8+100) | Shoulder and embankment constructions, surface applications, construction of drainage structures and construction of retaining structures | Rehabilitation / Improvement of Kandy Jaffna (A-009)(17+710 - 46+450), Thalgodapitiya - Yatawatta - Dombawela (B-409) (15+030 - 26+800), Palapathwela - Galewela Road B-346)(0+000 - 8+100) Roads | Central Province | Matale | Matale | 2 | Lahiru Construction and Consultants (Pvt) Ltd | Awarded | ”” | 2026-03-12 | 292,279,354.08 | 395,635,536.56 | 182 | 0 | ”” | 0.00 | 2026-05-02 | 2026-10-30 | 2026-05-02 | 68% | 100% | 30.6% | 89.58 | 292.28 | 17.24 | 100% | 70% | 50% | 0% | 0% | 30% | 50% | Yes | 52,461,047.84 | 0.00 | 23,455,869.73 | 14,693,549.16 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 15 | RDA/DRP/CEN/MTL/MTL/33 | 38 | 4 | Rehabilitation / Improvement of Wattegama Matale Road (5+280 - 13+160) and Ukuwela Railway station (0+000 - 0+190) | Wattegama Matale Road B 462,Approch road to Ukuwela Railway station B 027 | 5+280 - 13+160, 0+000 - 0+190 | Shoulder and embankment construction, surface application, construction of drainage structures and construction of retaining walls | Rehabilitation / Improvement of Wattegama Matale Road (5+280 - 13+160) and Ukuwela Railway station (0+000 - 0+190) | Central Province | Matale | Matale | 3 | Jayasinghe Construction (Pvt) Ltd | Awarded | RM&M | 2026-03-16 | 165,006,430.79 | 188,777,407.11 | 91 | 0 | ”” | 0.00 | 2026-05-02 | 2026-07-31 | — | 30% | 100% | 20.8% | 34.30 | 165.01 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | Yes | 29,068,239.71 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 16 | RDA/DRP/CEN/MTL/MTL/35 | 41 | 4 | Rehabilitation / Improvement of Rattota Gammaduwa Road (7+100 - 11+260) | Rattota Gammaduwa Road B 392 | 7+100 - 11+260 | Earth works, base and shoulder work surface application, construction of drainage structures, construction of retaining structures and culvert construction | Rehabilitation / Improvement of Rattota Gammaduwa Road (7+100 - 11+260) | Central Province | Matale | Matale | 5 | Kanwel Constructions & Civil Engineering (Pvt) Ltd | Awarded | ”” | 2026-03-16 | 266,607,902.15 | 291,904,507.83 | 182 | 0 | ”” | 0.00 | 2026-05-02 | 2026-10-30 | — | 63% | 100% | 33.6% | 89.50 | 266.61 | 0.00 | 100% | 100% | 100% | 0% | 0% | 15% | 27% | Yes | 46,351,528.36 | 0.00 | 29,493,532.24 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 17 | RDA/DRP/CEN/MTL/MTL/38 | ”” | 12 | Rehabilitation / Improvement of Kalalpitiya Ukuwela Elkaduwa Road (B 180) (0+000 - 13+470) | Kalalpitiya Ukuwela Elkaduwa Road | 0+000 - 13+470 | Earth works, base and shoulder work surface application, construction of drainage structures, construction of retaining structures | Rehabilitation / Improvement of Kalalpitiya Ukuwela Elkaduwa Road (B 180) (0+000 - 13+470) | Central Province | Matale | Matale | 8 | Ediriweera Construction | Awarded | ”” | 2026-07-06 | 281,166,339.80 | 304,428,814.88 | 182 | 0 | ”” | 0.00 | 2026-07-30 | 2027-01-27 | 2026-07-30 | 14% | 57.3% | 20.9% | 58.84 | 161.11 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | Yes | 49,863,459.10 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | Yes | — | — | — | — | — | ”” |
| 19 | RDA/DRP/CEN/MTL/MTL/41 | ”” | ”” | Rehabilitation / Improvement of Matale Illukkumbura Laggala Road (B 274) (4+000 - 18+000) | Matale-Illukkumbura- Laggala Road (B-274) | 4+000 - 18+000 | Earth works, base and shoulder work surface application, construction of drainage structures, construction of retaining structures and culvert construction | Rehabilitation / Improvement of Matale Illukkumbura Laggala Road (B 274) (4+000 - 18+000) | Central Province | Matale | Matale | 11 | Vikum Construction | Awarded | ”” | 2026-08-14 | 276,683,432.37 | 265,809,486.28 | 182 | 0 | ”” | 0.00 | 2026-09-02 | 2027-03-02 | 2026-09-02 | 11% | 24% | 0% | 0.00 | 66.40 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | Yes | Yes | Yes | — | — | — | — | — | — | — | — | — | ”” |
| 20 | RDA/DRP/CEN/MTL/NAL/48R | 130 | 11 | Rehabilitation/Improvement of surfacing (ASphalt) hard shoulder,Shoulder, drain construction at Beligamuwa - Hebarawa- Wilgamuwa Road (B-577) (6+260 -11+950) | Belaganwewa- Hebarawa- Wilgamuwa Road (B-577) (6+260 -11+950) | 6+260-11+950 | Surfacing (Asphalt) , hard shoulder, shoulder, drain construction | Rehabilitation/Improvement of surfacing (ASphalt) hard shoulder,Shoulder, drain construction at Beligamuwa - Hebarawa- Wilgamuwa Road (B-577) (6+260 -11+950) | Central Province | Matale | Nalanda | 6 | S A P Engineering (Pvt) Ltd | Awarded | ”” | 2026-08-31 | 50,471,466.08 | 42,736,925.80 | 154 | 0 | ”” | 0.00 | 2026-10-02 | 2027-03-04 | — | 5% | 11.9% | 0% | 0.00 | 6.01 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | Yes | Yes | Yes | — | — | — | — | — | — | — | — | — | ”” |
| 21 | RDA/DRP/CEN/MTL/NAL/49 | 124 | 11 | Rehabilitation /Improvement of Drains,Hard shoulder & Cash barrier at Naula- Elahera- Pallegama- Hettipola Road (B-312) (8+200-61+240) | Naula- Elahera-Pallegama-Hettipola Road (B-312) (8+200-61+240) | 8+200 - 61+240 | Shoulder work .Drains & Cash barrier | Rehabilitation /Improvement of Drains,Hard shoulder & Cash barrier at Naula- Elahera- Pallegama- Hettipola Road (B-312) (8+200-61+240) | Central Province | Matale | Nalanda | 7 | Platinum Holdings Lanka (Private) Limited | Awarded | ”” | 2026-05-29 | 44,706,119.13 | 56,512,677.41 | 154 | 0 | ”” | 0.00 | 2026-06-18 | 2026-11-18 | — | 70% | 96.7% | 32.5% | 14.55 | 43.23 | 0.00 | 100% | 0% | 0% | 0% | 0% | 0% | 0% | Yes | 7,270,523.42 | 0.00 | 5,063,036.56 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 22 | RDA/DRP/CEN/MTL/NAL/51 | 121 | 11 | Rehabilitation /Improvement of Retaining wall , drains and shoulder construction Bowathenna Access Road (B-064) (0+000-2+410) | Bowathenna Access Road (B-064) (0+000-2+410) | 0+000 - 2+410 | Retaning wall ,Drain and shoulder Constructions | Rehabilitation /Improvement of Retaining wall , drains and shoulder construction Bowathenna Access Road (B-064) (0+000-2+410) | Central Province | Matale | Nalanda | 9 | Platinum Holdings Lanka (Private) Limited | Awarded | ”” | 2026-05-29 | 17,458,592.78 | 25,992,198.15 | 119 | 0 | ”” | 0.00 | 2026-06-18 | 2026-10-14 | — | 90% | 100% | 32.3% | 5.64 | 17.46 | 2.94 | 100% | 0% | 0% | 0% | 0% | 0% | 0% | Yes | 2,700,844.13 | 0.00 | 2,081,765.36 | 2,488,679.18 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | Yes | — | — | — | — | — | ”” |
| 23 | RDA/DRP/CEN/NUE/HAN/57 | 140 | 12 | Rehabilitation / Improvement of Keerthibandarapura Naranthalawa Road ( B -511 ) ( 0+000 - 4+100 ) | Keerthibandarapura Naranthalawa Road ( B -511 ) ( 0+000 - 4+100 ) | ( 0+000 - 4+100 ) | Surfacing(Asphalt), Drain,Shoulder,Hard shoulder,Retaning wall Construction | Rehabilitation / Improvement of Keerthibandarapura Naranthalawa Road ( B -511 ) ( 0+000 - 4+100 ) | Central Province | Nuwara Eliya | Hanguranketha | 7 | Samindra Construction | Awarded | ”” | 2026-07-09 | 47,755,538.96 | 44,694,533.62 | 91 | 0 | ”” | 0.00 | 2026-07-30 | 2026-10-28 | 2026-07-30 | 30% | 100% | 19.4% | 9.25 | 47.76 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | Yes | 7,835,575.37 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | Yes | — | — | — | — | — | ”” |
| 24 | RDA/DRP/CEN/NUE/NUE/60R | 112 | 10 | Rehabilitation / Improvement of Peradeniya Badulla Chenkaladi Road (A005) (40+750 - 42+850) | Peradeniya Badulla Chenkaladi Road (A005) | 40+750 - 42+850 | Asphalt overlay, Retaining wall Construction, U Drain Construction & Culvert Construction | Rehabilitation / Improvement of Peradeniya Badulla Chenkaladi Road (A005) (40+750 - 42+850) | Central Province | Nuwara Eliya | Nuwara Eliya | 2 | KSJ Construction (Pvt) Ltd | Awarded | ”” | 2026-09-21 | 336,313,078.73 | 338,287,510.33 | 182 | 0 | ”” | 0.00 | 2026-10-07 | 2027-04-06 | 2026-10-07 | 10% | 5.5% | 0% | 0.00 | 18.50 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | Yes | Yes | Yes | — | — | — | — | — | — | — | — | — | ”” |
| 25 | RDA/DRP/CEN/NUE/NUE/66 | 34 | 3 | Rehabilitation / Improvement of Nuwara Eliya Town Road (0+000 - 1+695 ) (0+000 - 0+240 ) | Nuwara Eliya Town Road (B331) | 0 +000 - 1+695 0+000 - 0+240 | Road Marking, U Drain Construction & Culvert Construction | Rehabilitation / Improvement of Nuwara Eliya Town Road (0+000 - 1+695 ) (0+000 - 0+240 ) | Central Province | Nuwara Eliya | Nuwara Eliya | 7 | KSJ Construction (Pvt) Ltd | Awarded | ”” | 2026-03-12 | 161,841,095.70 | 205,630,098.81 | 91 | 0 | ”” | 0.00 | 2026-05-02 | 2026-07-31 | — | 69% | 100% | 31.8% | 51.43 | 161.84 | 9.86 | 100% | 100% | 100% | 0% | 0% | 50% | 30% | Yes | 28,951,653.76 | 0.00 | 14,629,744.09 | 8,358,462.69 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | Yes | — | — | — | — | ”” |
| 26 | RDA/DRP/CEN/NUE/NUE/67 | 35 | 3 | Rehabilitation / Improvement of Harangala - Kalapitiya - Kumbaloluwa Road (10+480 km - 17+140 km) | Harangala - Kalapitiya - Kumbaloluwa Road (B148) | 10+480 - 17+140 | Road Marking, U Drain Construction ,Shoulder Construction & Culvert Construction | Rehabilitation / Improvement of Harangala - Kalapitiya - Kumbaloluwa Road (10+480 km - 17+140 km) | Central Province | Nuwara Eliya | Nuwara Eliya | 8 | KSJ Construction (Pvt) Ltd | Awarded | ”” | 2026-03-17 | 239,417,811.34 | 302,933,613.60 | 182 | 0 | ”” | 0.00 | 2026-05-02 | 2026-10-30 | — | 78% | 100% | 42.6% | 101.99 | 239.42 | 0.00 | 100% | 90% | 80% | 0% | 0% | 30% | 40% | Yes | 43,196,511.18 | 0.00 | 43,235,770.89 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | Yes | — | — | — | — | ”” |
| 27 | RDA/DRP/CEN/NUE/NUE/68 | 37 | 4 | Rehabilitation / Improvement of Thawalanthenna Thalawakelle Road (0+000 - 8+000) & (10+000 - 33+200) | Thawalanthenna Thalawakelle Road (B412) | 0+000 - 8+000 & 10+000 - 33+200 | Asphalt overlay, Retaining wall Construction, U Drain Construction & Culvert Construction | Rehabilitation / Improvement of Thawalanthenna Thalawakelle Road (0+000 - 8+000) & (10+000 - 33+200) | Central Province | Nuwara Eliya | Nuwara Eliya | 9 | Green Scene Construction (Pvt) Ltd | Awarded | ”” | 2026-03-24 | 213,999,600.01 | 296,813,201.99 | 182 | 0 | ”” | 0.00 | 2026-05-02 | 2026-10-30 | — | 40% | 100% | 24.7% | 52.80 | 214.00 | 9.68 | 100% | 50% | 30% | 0% | 0% | 5% | ”” | Yes | 38,371,088.02 | 0.00 | 6,376,287.74 | 8,205,562.66 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 28 | RDA/DRP/CEN/NUE/NUE/69 | 42 | 4 | Rehabilitation / Improvement of Ulapane Pussallawa Road (6+440 - 15+950) | Ulapane Pussallawa Road (B431) | 6+440 - 15+950 | Road Marking Retaining wall Construction, Edge Wedining, Drain Construction & Culvert Construction | Rehabilitation / Improvement of Ulapane Pussallawa Road (6+440 - 15+950) | Central Province | Nuwara Eliya | Nuwara Eliya | 10 | Southern Group Civil Construction (Pvt) Ltd | Awarded | ”” | 2026-03-16 | 266,045,892.19 | 365,868,062.33 | 182 | 0 | ”” | 0.00 | 2026-05-02 | 2026-10-30 | — | 56% | 100% | 37% | 98.39 | 266.05 | 0.00 | 100% | 80% | 80% | 0% | 0% | 20% | 45% | Yes | 47,095,300.00 | 0.00 | 36,285,409.13 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | Yes | Yes | — | — | — | ”” |
| 29 | RDA/DRP/CEN/NUE/NUE/86 | 114 | 10 | Rehabilitation / Improvement of Approch road to R'way station (Watagoda/ Thalawakele) Road | Approch road to R'way station (Watagoda) Road | 0+000 - 0+110 0+000 - 0+160 | Asphalt overlay, Road Marking Drain Construction | Rehabilitation / Improvement of Approch road to R'way station (Watagoda/ Thalawakele) Road | Central Province | Nuwara Eliya | Nuwara Eliya | 27 | Pragathi Civil Construction | Awarded | ”” | 2026-05-19 | 33,765,626.86 | 41,996,395.31 | 91 | 0 | ”” | 0.00 | 2026-06-12 | 2026-09-10 | — | 20% | 100% | 0% | 0.00 | 33.77 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | — | — | Yes | Yes | Yes | — | — | — | Yes | — | — | — | — | — | ”” |
| 30 | RDA/DRP/CEN/NUE/NUR/97 | 115 | 10 | Rehabilitation/Improvement of Nawalapitiya Ginigathena Road (B-319)(7+200-12+200) | Nawalapitiya Ginigathena Road (B-319) | (7+200-12+200) | Asphalt overlay, Road Marking ,Retaining wall Construction,Drain Construction & Culvert Construction. | Rehabilitation/Improvement of Nawalapitiya Ginigathena Road (B-319)(7+200-12+200) | Central Province | Nuwara Eliya | Norwood | 11 | Jayawansa Construction (Pvt) Ltd | Awarded | RM&M | 2026-05-19 | 93,758,217.76 | 104,490,700.33 | 91 | 0 | ”” | 0.00 | 2026-06-17 | 2026-09-15 | — | 62% | 100% | 17.8% | 16.70 | 93.76 | 0.00 | 100% | 0% | 20% | 0% | 0% | 0% | 0% | Yes | 14,149,694.34 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 31 | RDA/DRP/CEN/NUE/NUR/98 | 116 | 10 | Rehabilitation/Improvement Harangala Kalapitiya Road (B-148) (0+000-10+700), Approach Road to Hrangala Dam Crest Road (B-491) (0+000-3+820), Nawalapitiya Harangala Road (B-306) (0+000-10+700) | Harangala Kalapitiya Road (B-148) (0+000-10+700), Approach Road to Harangala Dam Crest Road (B-491) (0+000-3+820), Nawalapitiya Harangala Road (B-306) (0+000-10+700) | ”” | Road Marking ,Retaining wall Construction,Drain Construction & Culvert Construction. | Rehabilitation/Improvement Harangala Kalapitiya Road (B-148) (0+000-10+700), Approach Road to Hrangala Dam Crest Road (B-491) (0+000-3+820), Nawalapitiya Harangala Road (B-306) (0+000-10+700) | Central Province | Nuwara Eliya | Norwood | 12 | Pragathi Civil Construction | Awarded | ”” | 2026-05-19 | 188,617,394.68 | 222,691,835.72 | 182 | 0 | ”” | 0.00 | 2026-06-18 | 2026-12-16 | — | 44% | 89.7% | 0% | 0.00 | 169.19 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | — | — | Yes | Yes | Yes | — | — | — | Yes | — | — | — | — | — | ”” |
| 32 | RDA/DRP/CEN/NUE/NUR/101 | 117 | 10 | Rehabilitation/Improvement of Hatton Maskeliya Delhouse Road (B-149) (0+000-31+970) | Hatton Maskeliya Delhouse Road (B-149) | (0+000-31+970) | Asphalt overlay, Road Marking ,Retaining wall Construction,Drain Construction & Culvert Construction. | Rehabilitation/Improvement of Hatton Maskeliya Delhouse Road (B-149) (0+000-31+970) | Central Province | Nuwara Eliya | Norwood | 15 | Sooriya Builders | Awarded | ”” | 2026-05-19 | 86,746,198.17 | 108,611,538.67 | 147 | 0 | ”” | 0.00 | 2026-06-18 | 2026-11-11 | 2026-06-18 | 31% | 98.3% | 20% | 17.35 | 85.27 | 0.00 | 0% | 0% | 0% | 0% | 0% | 0% | 0% | Yes | 14,701,825.21 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | Yes | — | — | — | — | — | ”” |
| 33 | RDA/DC/DRP/CP/NE/NRW/02 | ”” | ”” | REHABILITATION/ IMPROVEMENT OF APPROCH ROAD TO LAXAPANA POWER HOUSE ROAD CH 6+100 - 12+000 | REHABILITATION/ IMPROVEMENT OF APPROACH ROAD TO LAXAPANA POWER HOUSE ROAD CH (6+100 TO 12+000) KM | ”” | ”” | REHABILITATION/ IMPROVEMENT OF APPROCH ROAD TO LAXAPANA POWER HOUSE ROAD CH 6+100 - 12+000 | Central Province | Nuwara Eliya | Norwood | ”” | U.K.S Lanka Engineering (Pvt) Ltd | Awarded | ”” | 2026-07-16 | 374,859,845.10 | 348,620,000.00 | 365 | ”” | ”” | ”” | 2026-07-30 | 2027-07-29 | 2026-07-30 | 9% | 3.2% | 0% | 0.00 | 12.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | — | ”” |
| 34 | RDA/DC/DRP/CP/NE/NE/04 | ”” | ”” | REHABILITAION/ IMPROVEMENTS OF LADY MACALUMS DRIVE ROAD (2+850 - 5+600KM) | LADY MACALUMS DRIVE ROAD | (2+850 - 5+600KM) | ”” | REHABILITAION/ IMPROVEMENTS OF LADY MACALUMS DRIVE ROAD (2+850 - 5+600KM) | Central Province | Nuwara Eliya | Nuwara Eliya | ”” | KDA Weerasinghe & Co (Pvt) Ltd | Awarded | ”” | 2026-08-20 | 636,338,397.00 | 560,630,000.00 | 546 | 1 | ”” | ”” | 2026-09-17 | 2028-03-15 | 2026-10-07 | 1% | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | Yes | Yes | Yes | — | — | — | — | — | — | — | — | — | ”” |
| 35 | RDA/DC/DRP/SLOPE/CP/KDY/GAMPOLA-09 | ”” | ”” | MITIGATION OF FAILURES ALONG RDA ROADS DUE TO CYCLONE DITWAH GAMPOLA NAWALAPITIYA ROAD (AB013) CHAINAGE 10+350 KM | ”” | ”” | ”” | MITIGATION OF FAILURES ALONG RDA ROADS DUE TO CYCLONE DITWAH GAMPOLA NAWALAPITIYA ROAD (AB013) CHAINAGE 10+350 KM | Central Province | Kandy | Gampola | ”” | Sanguine Engineering (Pvt) Ltd | Awarded | DC | 2026-08-19 | 386,699,553.58 | 479,898,195.86 | 301 | ”” | ”” | ”” | 2026-09-03 | 2027-06-30 | 2026-09-05 | 9.3% | 2.7% | 0% | 0.00 | 10.44 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | Yes | Yes | Yes | — | — | — | — | — | — | — | — | — | ”” |
| 36 | RDA/DC/DRP/CP/NE/NRW/03 | ”” | ”” | REHABILITATION/ IMPROVEMENT TO ROZELLA RAILWAY STATION ROAD (0+000 - 3+300) KM AND WATAWALA RAILWAY STATION ROAD (0+000 - 1+850) KM | ”” | ”” | ”” | REHABILITATION/ IMPROVEMENT TO ROZELLA RAILWAY STATION ROAD (0+000 - 3+300) KM AND WATAWALA RAILWAY STATION ROAD (0+000 - 1+850) KM | Central Province | Nuwara Eliya | Norwood | ”” | Nagma Engineering (Pvt) Ltd | Awarded | DC | 2026-08-20 | 604,298,969.28 | 509,310,000.00 | 364 | ”” | ”” | ”” | 2026-09-16 | 2027-09-14 | 2026-09-16 | 19% | 0.4% | 0% | 0.00 | 2.42 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | Yes | Yes | Yes | — | — | — | — | — | — | — | — | — | ”” |
| 50 | RDA/DC/DRP/CP/NE/NE/14 | ”” | ”” | Rehabilitation/ Improvement of Lady Macalums Drive (0+000 - 2+700) | ”” | ”” | ”” | Rehabilitation/ Improvement of Lady Macalums Drive (0+000 - 2+700) | Central Province | Nuwara Eliya | Nuwara Eliya | ”” | K.D.A. Weerasinghe & Co. (Pvt) Ltd | Awarded | DC | 2026-10-12 | 711,929,618.35 | 575,100,000.00 | 546 | ”” | ”” | ”” | — | — | — | ”” | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 52 | RDA/DC/DRP/CP/NE/NE/05 | ”” | ”” | Rehabilitation/ Improvement of Blackpool Ambewela Pattipola Hortan Plains (5+200 - 12+000) | ”” | ”” | ”” | Rehabilitation/ Improvement of Blackpool Ambewela Pattipola Hortan Plains (5+200 - 12+000) | Central Province | Nuwara Eliya | Nuwara Eliya | ”” | Asset Engineering (Pvt) Ltd | Awarded | DC | 2026-09-21 | 791,681,996.67 | 612,060,000.00 | 546 | ”” | ”” | ”” | — | — | — | 0% | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 53 | RDA/DC/DRP/CP/NE/NE/01 | ”” | ”” | Rehabilitation/ Improvement of Blackpool Ambewela Pattipola Hortan Plains (12+500 - 18+000) | ”” | ”” | ”” | Rehabilitation/ Improvement of Blackpool Ambewela Pattipola Hortan Plains (12+500 - 18+000) | Central Province | Nuwara Eliya | Nuwara Eliya | ”” | Asset Engineering (Pvt) Ltd | Awarded | DC | 2026-10-12 | 744,680,423.80 | 605,620,000.00 | 546 | ”” | ”” | ”” | — | — | — | ”” | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 54 | RDA/DC/DRP/CP/NE/NE/09 | ”” | ”” | Rehabilitation/ Improvement to Blackpool Ambewela Pattipola Hortan Plains ( 19+000 - 23+000) | ”” | ”” | ”” | Rehabilitation/ Improvement to Blackpool Ambewela Pattipola Hortan Plains ( 19+000 - 23+000) | Central Province | Nuwara Eliya | Nuwara Eliya | ”” | Asset Engineering (Pvt) Ltd | Awarded | DC | 2026-10-20 | 607,139,242.74 | 487,070,000.00 | 546 | ”” | ”” | ”” | — | — | — | ”” | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 56 | RDA/DC/DRP/CP/NE/NE/07 | ”” | ”” | Rehabilitation/ Improvement to Gomburuoya - Balapokuna Road 0+000-8+500Without 5+250-5+450 & 6+900-7+150 | ”” | ”” | ”” | Rehabilitation/ Improvement to Gomburuoya - Balapokuna Road 0+000-8+500Without 5+250-5+450 & 6+900-7+150 | Central Province | Nuwara Eliya | Nuwara Eliya | ”” | Nagma Engineering (Pvt) Ltd | Awarded | DC | 2026-10-12 | 645,688,890.82 | 521,587,977.73 | 546 | ”” | ”” | ”” | — | — | — | 0% | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 60 | RDA/DC/DRP/SLOPE/PD(CP)/KDY/GPL/01 | ”” | ”” | Construction of Slope failure mitigation measures along Peradeniya-Badulla-Chenkaladi Road (A005) at Ch 0+030 km | ”” | ”” | ”” | Construction of Slope failure mitigation measures along Peradeniya-Badulla-Chenkaladi Road (A005) at Ch 0+030 km | Central Province | Kandy | Gampola | ”” | Weebadda Construction | Awarded | PD(CP) | 2026-09-14 | 22,481,370.00 | 26,379,398.72 | 105 | ”” | ”” | ”” | — | — | — | 0% | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 61 | RDA/DC/DRP/SLOPE/PD(CP)/KDY/GPL/11 | ”” | ”” | Construction of Slope failure mitigation measures along Galaha-Pupuressa-Delpitiya Road (B125) at Ch 5+700 km | ”” | ”” | ”” | Construction of Slope failure mitigation measures along Galaha-Pupuressa-Delpitiya Road (B125) at Ch 5+700 km | Central Province | Kandy | Gampola | ”” | J. Kodithuwakkuarachchi & Sons (Pvt) Ltd | Awarded | PD(CP) | 2026-10-26 | 17,724,816.00 | 16,121,754.76 | 105 | ”” | ”” | ”” | — | — | — | 0% | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 62 | RDA/DC/DRP/SLOPE/PD(CP)/KDY/GPL/14 | ”” | ”” | Construction of Slope failure mitigation measures along Atabage-Ulapane Road (B 490) at Ch 4+000 km | ”” | ”” | ”” | Construction of Slope failure mitigation measures along Atabage-Ulapane Road (B 490) at Ch 4+000 km | Central Province | Kandy | Gampola | ”” | Bandaranayake Builders and Construction | Awarded | ”” | 2026-09-14 | 24,796,315.46 | 23,436,975.14 | 105 | ”” | ”” | ”” | — | — | — | 0% | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 63 | RDA/DC/DRP/SLOPE/PD(CP)/KDY/GPL/29 | ”” | ”” | Construction of Slope failure mitigation measures along Peradeniya-Badulla-Chenkaladi Road (A005) at Ch 21+550 km | ”” | ”” | ”” | Construction of Slope failure mitigation measures along Peradeniya-Badulla-Chenkaladi Road (A005) at Ch 21+550 km | Central Province | Kandy | Gampola | ”” | Weebadda Construction | Awarded | ”” | 2026-09-14 | 28,806,688.50 | 34,156,473.18 | 105 | ”” | ”” | ”” | — | — | — | 0% | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 65 | RDA/DC/DRP/SLOPE/PD(CP)/KDY/KUN/26A | ”” | ”” | Construction of Slope failure mitigation measures along Kandy-Mahiyangana-Padiyathalawa Road (A026) at Culvert No 58/6 -58/5. | ”” | ”” | ”” | Construction of Slope failure mitigation measures along Kandy-Mahiyangana-Padiyathalawa Road (A026) at Culvert No 58/6 -58/5. | Central Province | Kandy | Kundasale | ”” | J. Kodithuwakkuarachchi & Sons (Pvt) Ltd | Awarded | PD(CP) | 2026-09-19 | 25,255,788.00 | 20,549,739.77 | 105 | ”” | ”” | ”” | — | — | — | 0% | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 72 | RDA/DC/DRP/SLOPE/PD(CP)/KDY/KUN/18,19&20 | ”” | ”” | Construction of Slope failure mitigation measures along Kandy – Mahiyangana – Padiyatalawa Road (A026) at Culvert No 47/5 Culvert No47/10, Culvert No 50/6-51+200 km and Culvert No 52/3-Culvert No 52/5 | ”” | ”” | ”” | Construction of Slope failure mitigation measures along Kandy – Mahiyangana – Padiyatalawa Road (A026) at Culvert No 47/5 Culvert No47/10, Culvert No 50/6-51+200 km and Culvert No 52/3-Culvert No 52/5 | Central Province | Kandy | Kundasale | ”” | J. Kodithuwakkuarachchi & Sons (Pvt) Ltd | Awarded | PD(CP) | 2026-09-14 | 19,636,680.00 | 16,043,059.21 | 105 | ”” | ”” | ”” | — | — | — | 0% | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 73 | RDA/DC/DRP/SLOPE/PD(CP)/KDY/KUN/1A | ”” | ”” | Construction of Slope failure mitigation measures along KandyMahiyanganaPadiyathalawa Road (A026) at Culvert No 25/3. | ”” | ”” | ”” | Construction of Slope failure mitigation measures along KandyMahiyanganaPadiyathalawa Road (A026) at Culvert No 25/3. | Central Province | Kandy | Kundasale | ”” | J. Kodithuwakkuarachchi & Sons (Pvt) Ltd | Awarded | PD(CP) | 2026-10-26 | 12,938,500.00 | 16,475,449.99 | 105 | ”” | ”” | ”” | — | — | — | ”” | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 76 | RDA/DC/DRP/SLOPE/PD(CP)/KDY/KAD/35 | ”” | ”” | Construction of Slope failure mitigation measures along Aladeniya-Eriyagama Road (B005) at Ch 3+700 RHS. | ”” | ”” | ”” | Construction of Slope failure mitigation measures along Aladeniya-Eriyagama Road (B005) at Ch 3+700 RHS. | Central Province | Kandy | Kadugannawa | ”” | Weebadda Construction | Awarded | ”” | 2026-10-26 | 26,072,370.00 | 28,669,432.07 | 105 | ”” | ”” | ”” | — | — | — | ”” | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 81 | RDA/DRP/SAB/KEG/KEG/14 | 1 | 1 | Rehabilitation / Improvement of Damaged Locations in Colombo Kandy Road from 56+050-98+950 | ”” | ”” | Retaining Structures | Rehabilitation / Improvement of Damaged Locations in Colombo Kandy Road from 56+050-98+950 | Sabaragamuwa Province | Kegalle | Kegalle | ”” | Tudawe Brothers (Pvt) Ltd | Awarded | ”” | 2026-03-12 | 261,228,130.78 | 267,884,733.58 | 91 | ”” | ”” | ”” | 2026-05-07 | 2026-08-05 | — | 65% | 100% | 30.7% | 80.24 | 261.23 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 47,252,023.78 | 0.00 | 20,746,920.91 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 82 | RDA/DRP/UVA/BAD/BAD/02 | 2 | 1 | Rehabilitation / Improvement of Demodara SpringValley Badulla Road (16+145-20+800) - selected Sections) (B-097) | ”” | ”” | Retaining Structures, Drainage construction | Rehabilitation / Improvement of Demodara SpringValley Badulla Road (16+145-20+800) - selected Sections) (B-097) | Uva Province | Badulla | Badulla | ”” | Priyankara Industries & Contractors | Awarded | ”” | 2026-03-12 | 241,775,532.44 | 286,001,165.69 | 180 | ”” | ”” | ”” | 2026-03-26 | 2026-09-22 | — | 66% | 100% | 14.7% | 35.53 | 241.78 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 30,108,187.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 83 | RDA/DRP/UVA/BAD/MAH/27 | 3 | 1 | Rehabilitation / Improvement of Dambagahapitiya Pinnagolla arawa Meegahakeula Road (8+200-8+250) (B-086)/ Bibile-Uraniya-Mahiyanganaya Road | ”” | ”” | Retaining Structures | Rehabilitation / Improvement of Dambagahapitiya Pinnagolla arawa Meegahakeula Road (8+200-8+250) (B-086)/ Bibile-Uraniya-Mahiyanganaya Road | Uva Province | Badulla | Badulla | ”” | EMA Construction (Pvt) Ltd | Awarded | ”” | 2026-03-12 | 73,623,757.90 | 103,692,871.49 | 180 | ”” | ”” | ”” | 2026-03-26 | 2026-09-21 | — | 79.5% | 100% | 38.8% | 28.59 | 73.62 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 12,938,138.00 | 0.00 | 11,290,160.08 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 86 | RDA/DRP/SAB/RAT/PEL/20 | 6 | 1 | Rehabilitation / Improvement of Pelmadulla - Pelmadulla - Embilipitiya - Nonagama (2+050 - 4+320) & Retaining wall Construction on Pelmadulla - Embilipitiya - Nonagama Road 5/4 - 5/5 (LHS) | ”” | ”” | Construction of retaing wall & Binder+wearing overlay for 2.270Km | Rehabilitation / Improvement of Pelmadulla - Pelmadulla - Embilipitiya - Nonagama (2+050 - 4+320) & Retaining wall Construction on Pelmadulla - Embilipitiya - Nonagama Road 5/4 - 5/5 (LHS) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | K.E.P. Construction | Awarded | ”” | 2026-03-12 | 194,327,188.51 | 224,909,805.06 | 91 | ”” | ”” | ”” | 2026-04-06 | 2026-07-06 | — | 31% | 100% | 26.7% | 51.80 | 194.33 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 34,694,816.09 | 0.00 | 9,204,185.86 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 87 | RDA/DRP/UVA/BAD/BAN/19 | 7 | 1 | Rehabilitation / Improvement of Bandarawela Liyangahawela Poonagala Road (5+000 -10+000) (B-042) | ”” | ”” | Asphalt overlaying and shoulder | Rehabilitation / Improvement of Bandarawela Liyangahawela Poonagala Road (5+000 -10+000) (B-042) | Uva Province | Badulla | Badulla | ”” | Senura Civil Engineering (Pvt) Ltd | Awarded | ”” | 2026-03-12 | 216,526,489.67 | 220,745,970.70 | 120 | ”” | ”” | ”” | 2026-03-26 | 2026-09-23 | — | 40% | 100% | 23.3% | 50.41 | 216.53 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 39,106,452.67 | 0.00 | 3,612,479.50 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 88 | RDA/DRP/UVA/BAD/BAN/15R | 8 | 14 | Rehabilitation / Improvement of Bandarawela Welimada Road (6+000-20+200) (B-044) | ”” | ”” | - | Rehabilitation / Improvement of Bandarawela Welimada Road (6+000-20+200) (B-044) | Uva Province | Badulla | Badulla | ”” | Subasingha Contractors (Pvt) Ltd | Awarded | ”” | — | 228,783,135.84 | 237,954,791.68 | 182 | ”” | ”” | ”” | 2026-09-04 | 2027-03-05 | — | 12% | 22.5% | 20.9% | 47.71 | 51.48 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 40,429,837.19 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 89 | RDA/DRP/SAB/KEG/KEG/16 | 9 | 1 | Rehabilitation / Improvement of Kegalle Siyambalapitiya Dewalegama Road, Polgahawela Kegalle Road and Mawanella Aranayaka Horewela Road | ”” | ”” | Retaining Structures | Rehabilitation / Improvement of Kegalle Siyambalapitiya Dewalegama Road, Polgahawela Kegalle Road and Mawanella Aranayaka Horewela Road | Sabaragamuwa Province | Kegalle | Kegalle | ”” | Creates Consultant and Construction | Awarded | ”” | 2026-03-12 | 258,281,578.64 | 278,060,284.20 | 91 | ”” | ”” | ”” | 2026-05-18 | 2026-08-16 | — | 60% | 100% | 32.7% | 84.58 | 258.28 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 46,770,287.02 | 0.00 | 24,905,821.11 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 90 | RDA/DRP/UVA/MON/MON/28 | 10 | 1 | Rehabilitation / Improvement of Colombo Galle Hambanthota Wellawaya Road (305+650-305+850) (AA-002), Wellawaya Ella Kumbalwela Road (0+800-1+825) (AA-023) and Kumbukkana Okkampitiya Maligawila Road (2+250-2+450) (B-513) | ”” | ”” | Retaining Structure | Rehabilitation / Improvement of Colombo Galle Hambanthota Wellawaya Road (305+650-305+850) (AA-002), Wellawaya Ella Kumbalwela Road (0+800-1+825) (AA-023) and Kumbukkana Okkampitiya Maligawila Road (2+250-2+450) (B-513) | Uva Province | Monaragala | Monaragala | ”” | EMA Construction (Pvt) Ltd | Awarded | ”” | 2026-03-12 | 86,302,421.23 | 118,529,679.67 | 180 | ”” | ”” | ”” | 2026-04-06 | 2026-10-02 | — | 59% | 100% | 37.1% | 32.06 | 86.30 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 14,975,349.32 | 0.00 | 12,190,246.60 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 91 | RDA/DRP/SAB/KEG/RUW/29 | 11 | 1 | Rehabilitation / Improvement of Dehiowita - Daraniyagala - Nooriya Road (From 13+845 to 23+850) | ”” | ”” | - | Rehabilitation / Improvement of Dehiowita - Daraniyagala - Nooriya Road (From 13+845 to 23+850) | Sabaragamuwa Province | Kegalle | Kegalle | ”” | SSP Engineers (Pvt) Ltd | Awarded | ”” | 2026-03-12 | 217,629,047.45 | 227,460,547.85 | 91 | ”” | ”” | ”” | 2026-03-25 | 2026-06-25 | — | 70% | 100% | 33.7% | 73.40 | 217.63 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 39,244,917.72 | 0.00 | 22,961,691.36 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 92 | RDA/DRP/UVA/BAD/BAN/17R | 12 | 14 | Rehabilitation / Improvement of Welimada Boralanda Ohiya Horton Plains (0+000 -32+470)(B-508) | ”” | ”” | - | Rehabilitation / Improvement of Welimada Boralanda Ohiya Horton Plains (0+000 -32+470)(B-508) | Uva Province | Badulla | Badulla | ”” | Shabi Lanka Construction | Awarded | ”” | — | 148,910,781.64 | 116,248,771.28 | 126 | ”” | ”” | ”” | 2026-09-04 | 2027-01-07 | — | 7% | 48.8% | 0% | 0.00 | 72.67 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | Yes | Yes | Yes | No | No | — | — | — | — | — | — | — | ”” |
| 93 | RDA/DRP/UVA/BAD/BAD/01 | 13 | 2 | Rehabilitation / Improvement of Badulla Karametiya Andaulpotha Road (0+000-20+000 - Selected Sections) (B-036) | ”” | ”” | Retaining structures | Rehabilitation / Improvement of Badulla Karametiya Andaulpotha Road (0+000-20+000 - Selected Sections) (B-036) | Uva Province | Badulla | Badulla | ”” | JD Builders | Awarded | ”” | 2026-03-16 | 210,946,129.78 | 292,708,768.01 | 182 | ”” | ”” | ”” | 2026-03-30 | 2026-09-27 | — | 71% | 100% | 10.9% | 23.01 | 210.95 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 19,500,366.76 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 94 | RDA/DRP/UVA/BAD/BAD/04 | 14 | 2 | Rehabilitation / Improvement of Dikwella Jagulla Thalpitigala Road (0+000-6+600 - Selected Sections) (B-100) | ”” | ”” | Retaining structures, Culvert construction | Rehabilitation / Improvement of Dikwella Jagulla Thalpitigala Road (0+000-6+600 - Selected Sections) (B-100) | Uva Province | Badulla | Badulla | ”” | PH Engineering & Construction (Pvt) Ltd | Awarded | ”” | 2026-03-16 | 272,601,362.28 | 318,107,616.89 | 182 | ”” | ”” | ”” | 2026-03-30 | 2026-09-27 | — | 67.5% | 100% | 25.1% | 68.46 | 272.60 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 48,371,884.05 | 0.00 | 9,646,049.39 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 95 | RDA/DRP/UVA/BAD/BAD/05 | 15 | 2 | Rehabilitation / Improvement of Dikwella Jagulla Thalpitigala Road 6+600-15+000 - Selected Sections) (B-100) | ”” | ”” | Retaining structures | Rehabilitation / Improvement of Dikwella Jagulla Thalpitigala Road 6+600-15+000 - Selected Sections) (B-100) | Uva Province | Badulla | Badulla | ”” | PH Engineering & Construction (Pvt) Ltd | Awarded | ”” | 2026-03-13 | 219,248,828.55 | 259,321,056.45 | 182 | ”” | ”” | ”” | 2026-03-27 | 2026-09-25 | — | 57.5% | 100% | 29.4% | 64.35 | 219.25 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 39,601,423.36 | 0.00 | 14,930,050.76 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 96 | RDA/DRP/UVA/BAD/BAN/14 | 16 | 2 | Rehabilitation / Improvement of Bandarawela Welimada Road (0+000-6+000) (B-044) | ”” | ”” | Retaining Structures | Rehabilitation / Improvement of Bandarawela Welimada Road (0+000-6+000) (B-044) | Uva Province | Badulla | Badulla | ”” | Senarathna Contractors | Awarded | ”” | 2026-03-13 | 232,880,104.48 | 274,546,113.13 | 182 | ”” | ”” | ”” | 2026-03-27 | 2026-09-24 | — | 73.5% | 100% | 0% | 0.00 | 232.88 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | — | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 97 | RDA/DRP/SAB/RAT/EMB/04 | 17 | 2 | Rehabilitation / Improvement of Galle - Deniyaya-Madampe Road (88+000-95+000) | ”” | ”” | Asphalt Over lay and Culvert Widening | Rehabilitation / Improvement of Galle - Deniyaya-Madampe Road (88+000-95+000) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | SN Projects Lanka (Pvt) Ltd | Awarded | ”” | 2026-03-20 | 290,799,045.34 | 318,792,416.26 | 91 | ”” | ”” | ”” | 2026-04-07 | 2026-07-07 | — | 22% | 100% | 2.1% | 6.17 | 290.80 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 5,231,585.53 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 98 | RDA/DRP/SAB/RAT/EMB/12 | 18 | 2 | Rehabilitation / Improvement of Galle -Deniyaya-Madampe Road (95+000-100+000) | ”” | ”” | Asphalt Over lay and Culvert Widening | Rehabilitation / Improvement of Galle -Deniyaya-Madampe Road (95+000-100+000) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | SN Projects Lanka (Pvt) Ltd | Awarded | ”” | 2026-03-13 | 290,733,855.40 | 319,465,519.22 | 91 | ”” | ”” | ”” | 2026-04-07 | 2026-07-07 | — | 26% | 100% | 3.5% | 10.31 | 290.73 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 8,733,087.54 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 99 | RDA/DRP/SAB/KEG/KEG/13 | 19 | 2 | Rehabilitation / Improvement of damage locations at Ambepussa Kurunegala Trincomalee Road, Warakapola Kandalama Road, Warakapola Buypass Road, Morontota Arandara Road, Galigamuwa Ruwanwella Road, Gevilipitiya Hettimulla Road, Kegalle Bulattkohupitiya, Karawanella Road, Mawanella Hemmathagama Gampola Road and Rambukkana Mawanella Road in Kegalle Executive Engineers Division. | ”” | ”” | ”” | Rehabilitation / Improvement of damage locations at Ambepussa Kurunegala Trincomalee Road, Warakapola Kandalama Road, Warakapola Buypass Road, Morontota Arandara Road, Galigamuwa Ruwanwella Road, Gevilipitiya Hettimulla Road, Kegalle Bulattkohupitiya, Karawanella Road, Mawanella Hemmathagama Gampola Road and Rambukkana Mawanella Road in Kegalle Executive Engineers Division. | Sabaragamuwa Province | Kegalle | Kegalle | ”” | Senarath Engineering (Pvt) Ltd | Awarded | ”” | 2026-03-13 | 247,437,818.24 | 258,512,761.66 | 91 | ”” | ”” | ”” | 2026-05-29 | 2026-08-29 | — | 75% | 100% | 34.8% | 86.19 | 247.44 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 44,718,694.22 | 0.00 | 28,325,241.21 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 101 | RDA/DRP/SAB/RAT/PEL/19 | 21 | 2 | Rehabilitation / Improvement and Retaining wall Construction of (Galle - Deniyaya - Madampe Road 144/1 - 144/2 RHS, 135-136/1 LHS & RHS, 137/5-137/4 LHS) & Pelmadulla - Embilipitiya - Nonagama Road 10/4 LHS, 18/1-18/2 LHS) | ”” | ”” | Construction of Retaining walls | Rehabilitation / Improvement and Retaining wall Construction of (Galle - Deniyaya - Madampe Road 144/1 - 144/2 RHS, 135-136/1 LHS & RHS, 137/5-137/4 LHS) & Pelmadulla - Embilipitiya - Nonagama Road 10/4 LHS, 18/1-18/2 LHS) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | Solinro Builders | Awarded | ”” | 2026-03-13 | 95,082,996.58 | 105,062,690.47 | 91 | ”” | ”” | ”” | 2026-04-07 | 2026-07-07 | — | 100% | 100% | 68% | 64.68 | 95.08 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 16,436,817.56 | 0.00 | 38,373,715.88 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 102 | RDA/DRP/SAB/RAT/RAT/22 | 22 | 2 | Rehabilitation / Improvement and Asphalt Overlaying on Ayagama Kukulegama Road | ”” | ”” | 6 km Asphalt Overlaying, Culvert Construction | Rehabilitation / Improvement and Asphalt Overlaying on Ayagama Kukulegama Road | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | Keangnam Engineering & Construction (Pvt) Ltd | Awarded | ”” | 2026-03-13 | 280,145,000.74 | 316,600,518.19 | 91 | ”” | ”” | ”” | 2026-03-27 | 2026-06-26 | — | 42.9% | 100% | 25.7% | 71.92 | 280.15 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 50,693,454.68 | 0.00 | 10,251,798.11 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 103 | RDA/DRP/SAB/RAT/RAT/26 | 23 | 2 | Rehabilitation / Improvement of Malwala - Carney Road (Ch. 11+000 - Ch. 14+972) | ”” | ”” | 4 km Asphalt Overlaying, Culvert Construction (Widening -18, Reconstrction - 5) | Rehabilitation / Improvement of Malwala - Carney Road (Ch. 11+000 - Ch. 14+972) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | SSP Engineers (Pvt) Ltd | Awarded | ”” | 2026-03-13 | 184,511,228.94 | 199,494,622.85 | 91 | ”” | ”” | ”” | 2026-04-07 | 2026-07-07 | — | 85.8% | 100% | 54.2% | 99.99 | 184.51 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 33,247,096.15 | 0.00 | 51,492,754.46 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 105 | RDA/DRP/SAB/RAT/RAT/25 | 25 | 3 | Rehabilitation / Improvement and Asphalt Overlaying on Malwana Charney (6+020 - 11+000) & Construction of Gabion Wall at 2+510, 2+847 | ”” | ”” | Construction of culverts, Edge Widening, Asphalt Overlaying & Construction of Gabion Walls | Rehabilitation / Improvement and Asphalt Overlaying on Malwana Charney (6+020 - 11+000) & Construction of Gabion Wall at 2+510, 2+847 | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | Wijeratne Construction | Awarded | ”” | 2026-03-13 | 242,356,869.50 | 269,615,801.69 | 91 | ”” | ”” | ”” | 2026-04-07 | 2026-07-07 | — | 62% | 100% | 35.3% | 85.49 | 242.36 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 43,834,885.36 | 0.00 | 28,618,169.49 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 106 | RDA/DRP/UVA/BAD/BAD/03 | 26 | 3 | Rehabilitation / Improvement of Peradeniya Badulla Chenkaladi Road (90+000-123+000) (AA-005) | ”” | ”” | Retainining structures, Drainage construction | Rehabilitation / Improvement of Peradeniya Badulla Chenkaladi Road (90+000-123+000) (AA-005) | Uva Province | Badulla | Badulla | ”” | Kanwel Constructions & Civil Engineering (Pvt) Ltd | Awarded | ”” | 2026-03-12 | 277,749,116.37 | 282,102,670.39 | 182 | ”” | ”” | ”” | 2026-03-26 | 2026-09-23 | — | 61% | 100% | 30.3% | 84.20 | 277.75 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 50,185,839.34 | 0.00 | 21,169,000.61 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 107 | RDA/DRP/UVA/BAD/BAD/06 | 27 | 3 | Rehabilitation / Improvement of Baragala Haliela Road (25+525-38+000 - Selected Sections) (AA-016) and Bandarawela Uva Highland Etampitiya Road (5+000-16+100) (B-043) | ”” | ”” | Retainining structures, Drainage construction | Rehabilitation / Improvement of Baragala Haliela Road (25+525-38+000 - Selected Sections) (AA-016) and Bandarawela Uva Highland Etampitiya Road (5+000-16+100) (B-043) | Uva Province | Badulla | Badulla | ”” | Kanwel Constructions & Civil Engineering (Pvt) Ltd | Awarded | ”” | 2026-03-12 | 254,882,804.50 | 302,416,798.70 | 182 | ”” | ”” | ”” | 2026-03-26 | 2026-09-24 | — | 57% | 100% | 26.1% | 66.48 | 254.88 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 46,112,328.10 | 0.00 | 10,226,785.33 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 108 | RDA/DRP/SAB/RAT/PEL/21 | 28 | 3 | Rehabilitation / Improvement of Pabahinna - Kubalgama - Rajawaka - Kapugala Road (2+000-7+700) & Retaining wall Construction of Colombo - Rathnapura - Wellawaya- Batticaloa Road (156/2 (RHS), 155/6, 133/7 - 133/8 (RHS), 122/5- 122/4 (RHS) | ”” | ”” | The project consists of laying a binder and wearing course overlay along a 5.7 km stretch of roadway. The structural scope includes the construction of four retaining walls | Rehabilitation / Improvement of Pabahinna - Kubalgama - Rajawaka - Kapugala Road (2+000-7+700) & Retaining wall Construction of Colombo - Rathnapura - Wellawaya- Batticaloa Road (156/2 (RHS), 155/6, 133/7 - 133/8 (RHS), 122/5- 122/4 (RHS) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | Samdam Engineering & Constructions (Pvt) Ltd | Awarded | ”” | 2026-03-13 | 184,536,305.86 | 215,458,780.20 | 91 | ”” | ”” | ”” | 2026-04-06 | 2026-07-06 | — | 32% | 100% | 31.7% | 58.44 | 184.54 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 32,689,055.61 | 0.00 | 16,835,858.95 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 109 | RDA/DRP/UVA/BAD/BAN/16 | 29 | 3 | Rehabilitation / Improvement of Rendapola Ambewela Road (0+000-1+435) (B-507) and Peradeniya Badulla Chenkaladi Road (76+000-90+000) (AA-005) | ”” | ”” | Retaining wall construction ,Gabion wall construction | Rehabilitation / Improvement of Rendapola Ambewela Road (0+000-1+435) (B-507) and Peradeniya Badulla Chenkaladi Road (76+000-90+000) (AA-005) | Uva Province | Badulla | Badulla | ”” | Subasingha Contractors (Pvt) Ltd | Awarded | ”” | 2023-03-19 | 297,237,284.97 | 293,827,930.50 | 182 | ”” | ”” | ”” | 2026-04-02 | 2026-09-30 | — | 66% | 100% | 27.8% | 82.60 | 297.24 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 52,382,042.73 | 0.00 | 17,613,760.68 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 110 | RDA/DRP/UVA/BAD/BAN/22 | 30 | 3 | REHABILITATION/IMPROVEMENT OF WELIMADA KIRKLEES ROAD ( From 0+000 to 17+250) | ”” | ”” | Retaining wall construction ,Gabion wall construction | REHABILITATION/IMPROVEMENT OF WELIMADA KIRKLEES ROAD ( From 0+000 to 17+250) | Uva Province | Badulla | Badulla | ”” | Suhada Enterprises | Awarded | ”” | 2026-03-13 | 246,717,227.79 | 288,759,369.79 | 182 | ”” | ”” | ”” | 2026-03-27 | 2026-09-24 | — | 77% | 100% | 26.5% | 65.48 | 246.72 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 43,575,677.78 | 0.00 | 11,918,226.56 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 111 | RDA/DRP/UVA/MON/BIB/25 | 31 | 3 | Rehabilitation / Improvement of Colombo Rathnapura Wellawaya Batticaloa Road (259+080-292+800) (AA-004), Siyabalanduwa damana Ampara Road (0+000-24+000) (AA-025) and Bibila Medagama Nakkala Road (0+000-33+240) (B-056) and Passara Monaragala Road (7+120-26+240) (AA-022) | ”” | ”” | Retaining wall construction ,Gabion wall construction | Rehabilitation / Improvement of Colombo Rathnapura Wellawaya Batticaloa Road (259+080-292+800) (AA-004), Siyabalanduwa damana Ampara Road (0+000-24+000) (AA-025) and Bibila Medagama Nakkala Road (0+000-33+240) (B-056) and Passara Monaragala Road (7+120-26+240) (AA-022) | Uva Province | Monaragala | Monaragala | ”” | Ediriweera Construction | Awarded | ”” | — | 74,036,604.05 | 103,821,878.45 | 182 | ”” | ”” | ”” | 2026-04-07 | 2026-10-05 | — | 51% | 100% | 36.6% | 27.10 | 74.04 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 13,071,200.73 | 0.00 | 9,893,127.60 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 112 | RDA/DRP/SAB/RAT/RAT/24 | 32 | 3 | Rehabilitation / Improvement and Asphalt Overlaying on Kalawana - Deepdeen Rakwana (4+255-9+809) | ”” | ”” | Widening and Asphalt overlaying, Retaing walls, culvert and Drains at necessary locations | Rehabilitation / Improvement and Asphalt Overlaying on Kalawana - Deepdeen Rakwana (4+255-9+809) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | SSP Engineers (Pvt) Ltd | Awarded | ”” | 2026-03-19 | 236,752,750.59 | 264,741,911.81 | 91 | ”” | ”” | ”” | 2026-04-07 | 2026-06-24 | — | 85% | 100% | 36.4% | 86.13 | 236.75 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 41,882,954.64 | 0.00 | 31,108,406.97 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 113 | RDA/DRP/SAB/KEG/RUW/28 | 45 | 4 | Rehabilitation / Improvement of Bulathkohupitiya Dedugala Road, Warakapola Ruwanwella Road, Alawathura- Yatapana - Kotiyakumbura Road and Avissawella - Hatton - Nuwaraeliya Road | ”” | ”” | ”” | Rehabilitation / Improvement of Bulathkohupitiya Dedugala Road, Warakapola Ruwanwella Road, Alawathura- Yatapana - Kotiyakumbura Road and Avissawella - Hatton - Nuwaraeliya Road | Sabaragamuwa Province | Kegalle | Kegalle | ”” | Southern Group Civil Construction (Pvt) Ltd | Awarded | ”” | 2026-03-26 | 260,537,133.84 | 284,539,377.98 | 91 | ”” | ”” | ”” | 2026-06-10 | 2026-09-11 | — | 50% | 100% | 25.6% | 66.81 | 260.54 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 44,944,387.98 | 0.00 | 11,670,294.05 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 114 | RDA/DRP/SAB/KEG/RUW/33R | 46 | 14 | Yatiyanthota - Poonagala - Meenagala Road (from 3+760 to 6+760) | ”” | ”” | Asphalt Overlaying | Yatiyanthota - Poonagala - Meenagala Road (from 3+760 to 6+760) | Sabaragamuwa Province | Kegalle | Kegalle | ”” | KENT Engineering (Pvt) Ltd | Awarded | ”” | — | 284,248,590.98 | 251,822,503.71 | 154 | ”” | ”” | ”” | 2026-09-11 | 2027-02-12 | — | 0% | 27.3% | 0% | 0.00 | 77.60 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | — | — | — | Yes | No | — | — | — | — | — | — | — | ”” |
| 115 | RDA/DRP/SAB/KEG/RUW/34R | 47 | 14 | Yatiyanthota - Poonagala - Meenagala Road (from 6+760 to 9+000) | ”” | ”” | Asphalt Overlaying | Yatiyanthota - Poonagala - Meenagala Road (from 6+760 to 9+000) | Sabaragamuwa Province | Kegalle | Kegalle | ”” | KENT Engineering (Pvt) Ltd | Awarded | ”” | — | 301,661,961.22 | 292,200,028.87 | 182 | ”” | ”” | ”” | 2026-09-11 | 2027-03-12 | — | 0% | 17.6% | 0% | 0.00 | 53.09 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | — | — | — | Yes | No | — | — | — | — | — | — | — | ”” |
| 116 | RDA/DRP/SAB/KEG/RUW/35 | 48 | 4 | Yatiyanthota - Poonagala - Meenagala Road (from 13+400 to 18+200) | ”” | ”” | Asphalt Overlaying | Yatiyanthota - Poonagala - Meenagala Road (from 13+400 to 18+200) | Sabaragamuwa Province | Kegalle | Kegalle | ”” | Southern Group Civil Construction (Pvt) Ltd | Awarded | ”” | 2026-03-12 | 170,714,785.54 | 172,314,426.38 | 91 | ”” | ”” | ”” | 2026-06-10 | 2026-09-11 | — | 25% | 100% | 24.2% | 41.33 | 170.71 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 30,937,051.92 | 0.00 | 4,255,880.15 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 117 | RDA/DPR/NCP/ANU/ANU/02 | 49 | 5 | Rehabilitation / Improvement and Construction of Drainge Canal for Kumbichchan Kulama Spillway on Maitreepala Senanayake Mawatha (1+970 - 2+090 km) | ”” | ”” | Construction of Drainage Canal | Rehabilitation / Improvement and Construction of Drainge Canal for Kumbichchan Kulama Spillway on Maitreepala Senanayake Mawatha (1+970 - 2+090 km) | North Central Province | Anuradhapura | Anuradhapura | ”” | SMA Construction (Pvt) Ltd | Awarded | ”” | 2026-04-06 | 138,891,057.65 | 178,990,814.77 | 182 | ”” | ”” | ”” | 2026-04-20 | 2026-10-19 | — | 50% | 100% | 18.4% | 25.54 | 138.89 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 21,646,336.39 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 118 | RDA/DPR/NCP/ANU/ANU/03 | 50 | 5 | Rehabilitation / Improvement Construction of Drainge Canal for Thambuttegama Tank Spill on Padeniya - Anuradhapura Road (59+420 - 59+610) & Construction of Drainge Canal for Protection Road on Andarawewa - Balaluwewa Road(16+580 - 16+680) | ”” | ”” | Construction of Drainage Canal | Rehabilitation / Improvement Construction of Drainge Canal for Thambuttegama Tank Spill on Padeniya - Anuradhapura Road (59+420 - 59+610) & Construction of Drainge Canal for Protection Road on Andarawewa - Balaluwewa Road(16+580 - 16+680) | North Central Province | Anuradhapura | Anuradhapura | ”” | SMA Construction (Pvt) Ltd | Awarded | ”” | 2026-04-06 | 132,437,825.50 | 174,596,369.90 | 182 | ”” | ”” | ”” | 2026-04-20 | 2026-10-19 | — | 38% | 100% | 20.6% | 27.26 | 132.44 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 23,099,490.20 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 119 | RDA/DRP/WP/GAM/NEG/19 | 51 | 5 | Rehabilitation / Improvement of Negombo-Mirigama Road (5+000-6+000) and Negombo-Giriulla Road (29+000-34+000) | ”” | ”” | Asphalt Overlaying, culvert & drain construction | Rehabilitation / Improvement of Negombo-Mirigama Road (5+000-6+000) and Negombo-Giriulla Road (29+000-34+000) | Western Province | Gampaha | Gampaha | ”” | Tudawe Brothers (Pvt) Ltd | Awarded | ”” | 2026-04-06 | 206,184,462.57 | 222,010,882.78 | 182 | ”” | ”” | ”” | 2026-05-04 | 2026-11-02 | — | 20% | 100% | 21.4% | 44.19 | 206.18 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 37,452,084.10 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 120 | RDA/DRP/WP/GAM/NIT/21 | 52 | 5 | Rehabilitation / Improvement of Hanwella Urapola Road (3+000 - 10+100), Structure Construction on Delgoda Dompe Giridara Road (0+000- 10+070) and Urapola Wathuragama Road (0+000- 7+080 ) and Drain Construction on Negombo-Mirigama road (21+000 - 30+580) | ”” | ”” | Asphalt Overlaying, culvert, drain & retaning wall construction | Rehabilitation / Improvement of Hanwella Urapola Road (3+000 - 10+100), Structure Construction on Delgoda Dompe Giridara Road (0+000- 10+070) and Urapola Wathuragama Road (0+000- 7+080 ) and Drain Construction on Negombo-Mirigama road (21+000 - 30+580) | Western Province | Gampaha | Gampaha | ”” | Tudawe Brothers (Pvt) Ltd | Awarded | ”” | 2026-04-06 | 221,768,903.84 | 231,075,356.57 | 182 | ”” | ”” | ”” | 2026-05-04 | 2026-11-02 | — | 28% | 100% | 20.9% | 46.35 | 221.77 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 39,283,558.31 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 121 | RDA/DRP/WP/GAM/GAM/10 | 53 | 5 | Rehabilitation / Improvement of Old Minuwangoda Gampaha - Miriswatta Road (9+000 - 10+000) and Minuwangoda - Gampaha Road (0+000 - 5+300) | ”” | ”” | Asphalt Overlaying | Rehabilitation / Improvement of Old Minuwangoda Gampaha - Miriswatta Road (9+000 - 10+000) and Minuwangoda - Gampaha Road (0+000 - 5+300) | Western Province | Gampaha | Gampaha | ”” | Senarath Engineering (Pvt) Ltd | Awarded | ”” | 2026-04-06 | 92,177,672.52 | 110,481,340.20 | 91 | ”” | ”” | ”” | 2026-04-24 | 2026-07-24 | — | 2% | 100% | 21.4% | 19.76 | 92.18 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 16,747,576.82 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 122 | RDA/DRP/WP/GAM/GAM/12 | 54 | 5 | Rehabilitation / Improvement of Acces Road to Peliyagoda interchange (0+000 - 2+100), Colombo - Kandy Road (6+500-19+000) and Kelaniya - Waragoda Road (0+000-3+220) | ”” | ”” | Asphalt Overlaying | Rehabilitation / Improvement of Acces Road to Peliyagoda interchange (0+000 - 2+100), Colombo - Kandy Road (6+500-19+000) and Kelaniya - Waragoda Road (0+000-3+220) | Western Province | Gampaha | Gampaha | ”” | Senarath Engineering (Pvt) Ltd | Awarded | ”” | 2026-04-06 | 151,956,608.92 | 170,010,323.36 | 91 | ”” | ”” | ”” | 2026-04-24 | 2026-07-24 | — | 2% | 100% | 21.4% | 32.53 | 151.96 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 27,570,474.35 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 124 | RDA/DRP/WP/GAM/NIT/20 | 56 | 5 | Rehabilitation / Improvement of Bothale Mirigama Road (3+750-4+800), Warakapola Kandalama Road (7+000-8+000), (8+500-9+000) & (9+500-10+900), Negombo Mirigama Road and Construction of Gabion Wall on Colombo - Kandy Road at 54+950,Warakapola Kandalama Road at Culvert No. 10/4 LHS and Widening of Culvert Nos. 4/1 LHS 4/3 Bothsides and Reconstruction of Culvert No. 4/2 on Veyangoda Banduragoda Road | ”” | ”” | Asphalt Overlaying, culvert & retaining wall construction | Rehabilitation / Improvement of Bothale Mirigama Road (3+750-4+800), Warakapola Kandalama Road (7+000-8+000), (8+500-9+000) & (9+500-10+900), Negombo Mirigama Road and Construction of Gabion Wall on Colombo - Kandy Road at 54+950,Warakapola Kandalama Road at Culvert No. 10/4 LHS and Widening of Culvert Nos. 4/1 LHS 4/3 Bothsides and Reconstruction of Culvert No. 4/2 on Veyangoda Banduragoda Road | Western Province | Gampaha | Gampaha | ”” | Jeyanthan Construction | Awarded | ”” | 2026-04-06 | 217,881,464.96 | 245,395,696.16 | 91 | ”” | ”” | ”” | 2026-06-04 | 2026-09-03 | — | 46% | 100% | 0% | 0.00 | 217.88 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | No | — | Yes | Yes | Yes | Yes | No | — | — | — | — | — | — | — | ”” |
| 125 | RDA/DRP/WP/GAM/NIT/22 | 57 | 5 | Rehabilitation / Improvement of Delgoda Dompe Giridara Road (Selected Sections between 2+000-12+100) | ”” | ”” | Asphalt Overlaying | Rehabilitation / Improvement of Delgoda Dompe Giridara Road (Selected Sections between 2+000-12+100) | Western Province | Gampaha | Gampaha | ”” | Senarath Engineering (Pvt) Ltd | Awarded | ”” | 2026-04-06 | 264,745,054.48 | 294,920,837.23 | 182 | ”” | ”” | ”” | 2026-04-24 | 2026-10-23 | — | 1% | 100% | 21.2% | 56.23 | 264.75 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 47,651,364.45 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 126 | RDA/DRP/WP/GAM/NIT/23 | 58 | 5 | Rehabilitation / Improvement of Kalagedihena Veyangoda Road (0+000 -3+000), Pasyala Attanagalla Road (0+000 - 6+400) and Colombo - Kandy Road (38+620 -38+720) | ”” | ”” | Asphalt Overlaying | Rehabilitation / Improvement of Kalagedihena Veyangoda Road (0+000 -3+000), Pasyala Attanagalla Road (0+000 - 6+400) and Colombo - Kandy Road (38+620 -38+720) | Western Province | Gampaha | Gampaha | ”” | Senarath Engineering (Pvt) Ltd | Awarded | ”” | 2026-04-06 | 258,218,314.97 | 305,207,472.65 | 182 | ”” | ”” | ”” | 2026-04-24 | 2026-10-23 | — | 1% | 100% | 20.9% | 53.99 | 258.22 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 45,755,884.54 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 127 | RDA/DRP/SAB/KEG/RUW/30 | 59 | 5 | Rehabilitation of Dehiovita - Daraniyagala - Nooriya Road (from 23+850 to 27+960) due to catastrophic disaster cyclone Ditwa | ”” | ”” | - | Rehabilitation of Dehiovita - Daraniyagala - Nooriya Road (from 23+850 to 27+960) due to catastrophic disaster cyclone Ditwa | Sabaragamuwa Province | Kegalle | Kegalle | ”” | Accon Engineering (Pvt) Ltd | Awarded | ”” | 2026-04-06 | 169,223,910.80 | 179,826,720.59 | 91 | ”” | ”” | ”” | 2026-05-22 | 2026-08-21 | — | 68% | 100% | 28.2% | 47.71 | 169.22 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 30,441,983.79 | 0.00 | 9,989,836.66 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 128 | RDA/DRP/SAB/KEG/RUW/31 | 60 | 5 | Rehabilitation of Kegalle - Bulathkohupitiya - Karawanella Road due to catastrophic disaster cyclone Ditwa | ”” | ”” | - | Rehabilitation of Kegalle - Bulathkohupitiya - Karawanella Road due to catastrophic disaster cyclone Ditwa | Sabaragamuwa Province | Kegalle | Kegalle | ”” | Tudawe Brothers (Pvt) Ltd | Awarded | ”” | 2026-04-06 | 269,890,586.86 | 284,390,126.90 | 91 | ”” | ”” | ”” | 2026-06-01 | 2026-08-31 | — | 18% | 100% | 25.2% | 68.13 | 269.89 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 48,845,015.80 | 0.00 | 8,891,636.65 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 129 | RDA/DRP/WP/COL/AVI/02 | 61 | 6 | Rehabilitation / Improvement of Damage Sections on Colombo - Hanwella Low Level Road (AB010) (23+000 - 26+715) & Hanwella Cross Road (B145) (0+000 - 0+800) | ”” | ”” | Asphalt Overlaying,Gabian wall & Builtup drains,Sholder repair | Rehabilitation / Improvement of Damage Sections on Colombo - Hanwella Low Level Road (AB010) (23+000 - 26+715) & Hanwella Cross Road (B145) (0+000 - 0+800) | Western Province | Colombo | Colombo | ”” | Keangnam Engineering & Construction (Pvt) Ltd | Awarded | ”” | 2026-04-07 | 279,374,027.90 | 299,392,762.20 | 91 | ”” | ”” | ”” | 2026-04-21 | 2026-07-21 | — | 29% | 100% | 2.9% | 8.06 | 279.37 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 6,828,549.84 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 130 | RDA/DRP/WP/COL/AVI/03 | 62 | 6 | Rehabilitation / Improvement and Asphalt Overlaying on Colombo - Horana Road (B084) (10+500 - 13+500) | ”” | ”” | Asphalt Overlaying | Rehabilitation / Improvement and Asphalt Overlaying on Colombo - Horana Road (B084) (10+500 - 13+500) | Western Province | Colombo | Colombo | ”” | Keangnam Engineering & Construction (Pvt) Ltd | Awarded | ”” | 2026-04-07 | 176,739,557.41 | 201,633,881.18 | 63 | ”” | ”” | ”” | 2026-04-21 | 2026-06-23 | — | 3% | 100% | 0.8% | 1.44 | 176.74 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 382,642.19 | 0.00 | 838,664.06 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 131 | RDA/DRP/WP/COL/AVI/04 | 63 | 6 | Rehabilitation / Improvement and Asphalt Overlaying on Mampe Kottawa Road (B267) (0+750 - 3+400) (5+100 - 6+120)) | ”” | ”” | Asphalt Overlaying | Rehabilitation / Improvement and Asphalt Overlaying on Mampe Kottawa Road (B267) (0+750 - 3+400) (5+100 - 6+120)) | Western Province | Colombo | Colombo | ”” | Keangnam Engineering & Construction (Pvt) Ltd | Awarded | ”” | 2026-04-07 | 94,697,340.01 | 108,030,624.38 | 63 | ”” | ”” | ”” | 2026-04-21 | 2026-06-23 | — | 65% | 100% | 59.1% | 55.94 | 94.70 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 17,192,698.18 | 0.00 | 30,212,899.20 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 132 | RDA/DRP/WP/COL/AVI/05 | 64 | 6 | Rehabilitation / Improvement and Asphalt Overlaying on Panagoda Henpita Road (B354) (0+000 - 6+440) | ”” | ”” | Asphalt Overlaying | Rehabilitation / Improvement and Asphalt Overlaying on Panagoda Henpita Road (B354) (0+000 - 6+440) | Western Province | Colombo | Colombo | ”” | Keangnam Engineering & Construction (Pvt) Ltd | Awarded | ”” | 2026-04-07 | 225,228,168.18 | 250,078,803.62 | 63 | ”” | ”” | ”” | 2026-04-21 | 2026-06-23 | — | 3% | 100% | 0.9% | 1.93 | 225.23 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 1,635,814.91 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 133 | RDA/DRP/NWP/KURU/KULI/01R | 65 | 13 | Rehabilitation / Improvement of Selected Sections on Pannala Kuliyapitiya Road (B356) (0+000-6+000), Dandagamuwa Udawela Road (B088) (4+000 - 6+000), Marawila Udubaddawa Road (B272) (11+000 - 12+000), Kurunegala Narammala Madampe Road (B247) (52+000 - 54+000), Narammala Dankotuwa Road (B308) (16+000-37+000) and Alawwa Maharagama Road (B009) (1+000 - 14+200) in Kuliyapitiya EE Division | ”” | ”” | - | Rehabilitation / Improvement of Selected Sections on Pannala Kuliyapitiya Road (B356) (0+000-6+000), Dandagamuwa Udawela Road (B088) (4+000 - 6+000), Marawila Udubaddawa Road (B272) (11+000 - 12+000), Kurunegala Narammala Madampe Road (B247) (52+000 - 54+000), Narammala Dankotuwa Road (B308) (16+000-37+000) and Alawwa Maharagama Road (B009) (1+000 - 14+200) in Kuliyapitiya EE Division | North Western Province | Kurunegala | Kurunegala | ”” | Can Construction and Consultancy (Pvt) Ltd | Awarded | ”” | — | 181,456,551.09 | ”” | 119 | ”” | ”” | ”” | 2026-08-28 | 2026-12-25 | — | 12% | 61.3% | 0% | 0.00 | 111.23 | 38.88 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 0.00 | 32,952,100.20 | 0.00 | 0.00 | Yes | Yes | Yes | — | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 134 | RDA/DRP/NWP/KURU/KURU/02R | 66 | 14 | Rehabilitation / Improvement and Structure Improvement of Mallawapitiya Rambodagalla Keppitigala Road (30+943 - 33+858), Katugasthota Kurunegala Puttalam Road (AA010) (30+000 - 34+600) and Mawathagama Muwankanda Road (B281) (0+000 - 7+000) | ”” | ”” | Construction of retaining walls and toe walls Construction of gabion walls | Rehabilitation / Improvement and Structure Improvement of Mallawapitiya Rambodagalla Keppitigala Road (30+943 - 33+858), Katugasthota Kurunegala Puttalam Road (AA010) (30+000 - 34+600) and Mawathagama Muwankanda Road (B281) (0+000 - 7+000) | North Western Province | Kurunegala | Kurunegala | ”” | Can Construction and Consultancy (Pvt) Ltd | Awarded | ”” | — | 208,660,417.21 | 192,045,728.78 | 91 | ”” | ”” | ”” | 2026-09-11 | 2027-03-11 | — | 0% | 63% | 0% | 0.00 | 131.46 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | — | — | — | No | No | — | — | — | — | — | — | — | ”” |
| 135 | RDA/DRP/NWP/KURU/KURU/03R | 67 | 15 | Rehabilitation / Improvement of Thalgodapitiya Yatawaththa Road (B409) (9+100 - 14+650) | ”” | ”” | Construction of toe walls Construction of gabion walls | Rehabilitation / Improvement of Thalgodapitiya Yatawaththa Road (B409) (9+100 - 14+650) | North Western Province | Kurunegala | Kurunegala | ”” | Jayawansa Construction (Pvt) Ltd | Awarded | ”” | — | 129,109,243.85 | 117,113,346.84 | 91 | ”” | ”” | ”” | 2026-09-29 | 2027-03-29 | — | 0% | 38.3% | 0% | 0.00 | 49.45 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | — | — | — | No | No | — | — | — | — | — | — | — | ”” |
| 136 | RDA/DRP/NWP/KURU/KURU/04 | 68 | 6 | Rehabilitation / Improvement of Muththettugala Hiripitiya Road (B300) (10+880 - 11+080) & Vilakatupotha Ganewatta Kumbukgete road (B478) (9+100 - 9+400) | ”” | ”” | Construction of rip rap protection, Culvert construction, Rectification of the pavement | Rehabilitation / Improvement of Muththettugala Hiripitiya Road (B300) (10+880 - 11+080) & Vilakatupotha Ganewatta Kumbukgete road (B478) (9+100 - 9+400) | North Western Province | Kurunegala | Kurunegala | ”” | TMC Construction (Pvt) Ltd | Awarded | ”” | 2026-04-07 | 97,503,423.17 | 105,193,927.73 | 91 | ”” | ”” | ”” | 2026-04-21 | 2026-07-22 | — | 62% | 100% | 33.2% | 32.34 | 97.50 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 16,053,895.12 | 0.00 | 11,350,228.21 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 137 | RDA/DRP/NWP/KURU/MAHO/05 | 69 | 6 | Rehabilitation / Improvement of Galgamuwa - Nikawewa Road (B126) (6+000-20+000), Danikithawa - Ambanpola Road (B089) (20+925 - 21+000), Nikaweratiya - Moragollagama - Siyambalangamuwa Road (B326) (40+760 - 48+240), Malsiripura - Rambe Road (B610) (7+500 - 9+650), Ibbagamuwa - Kumbukgate - Madagalla Road (B159) (16+450 - 28+680), Hiripitiya - Galtenwewa Road (B609) (9+580-9+680), Padeniya - Anuradapura Road (AA028) (8+480-8+800) and Katugasthota - Kurunegala - Puththalama Road (AA010) (73+745-73 -870) in Maho EE Division | ”” | ”” | Rectification of hard shoulder Construction of gabion wall Construction of reataining wall Construction of rIp rap protection Asphalt laying | Rehabilitation / Improvement of Galgamuwa - Nikawewa Road (B126) (6+000-20+000), Danikithawa - Ambanpola Road (B089) (20+925 - 21+000), Nikaweratiya - Moragollagama - Siyambalangamuwa Road (B326) (40+760 - 48+240), Malsiripura - Rambe Road (B610) (7+500 - 9+650), Ibbagamuwa - Kumbukgate - Madagalla Road (B159) (16+450 - 28+680), Hiripitiya - Galtenwewa Road (B609) (9+580-9+680), Padeniya - Anuradapura Road (AA028) (8+480-8+800) and Katugasthota - Kurunegala - Puththalama Road (AA010) (73+745-73 -870) in Maho EE Division | North Western Province | Kurunegala | Kurunegala | ”” | St. Anthony's Construction | Awarded | ”” | 2026-04-07 | 151,515,024.36 | 166,163,663.09 | 119 | ”” | ”” | ”” | 2026-05-05 | 2026-09-01 | — | 70% | 100% | 21.5% | 32.51 | 151.52 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 27,548,186.25 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 138 | RDA/DRP/SAB/RAT/EMB/01 | 70 | 6 | Rehabilitation / Improvement of Kalawana - Deepdeen - Rakwana Road (15+000-46+000) | ”” | ”” | Construction of Road Damaged Loaction | Rehabilitation / Improvement of Kalawana - Deepdeen - Rakwana Road (15+000-46+000) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | SSP Engineers (Pvt) Ltd | Awarded | ”” | 2026-04-07 | 287,333,615.63 | 291,908,137.80 | 91 | ”” | ”” | ”” | 2026-05-15 | 2026-08-14 | — | 62% | 100% | 31.3% | 89.82 | 287.33 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 51,920,475.56 | 0.00 | 24,197,450.30 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 139 | RDA/DRP/SAB/RAT/EMB/02 | 71 | 6 | Rehabilitation / Improvement of Pelmadulla - Embilipitiya - Nonagama Road (40+500-43+300) | ”” | ”” | 2.8 km (Wearing+Binder), Culvert Nos 2, Drain Construction | Rehabilitation / Improvement of Pelmadulla - Embilipitiya - Nonagama Road (40+500-43+300) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | Anura Construction | Awarded | ”” | 2026-04-07 | 260,511,600.34 | 297,894,808.58 | 91 | ”” | ”” | ”” | 2026-04-24 | 2026-07-24 | — | 21% | 100% | 21.3% | 55.58 | 260.51 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 47,101,745.52 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 140 | RDA/DRP/SAB/RAT/EMB/03R | 72 | 14 | Rehabilitation / Improvement of Embilipitiya - Panamura - Buluthota Road (0+000-39+000) | ”” | ”” | Asphalt over laying, Culvert, drain, retaing wall | Rehabilitation / Improvement of Embilipitiya - Panamura - Buluthota Road (0+000-39+000) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | Samarasinghe Construction Pvt Ltd | Awarded | ”” | — | 288,699,729.18 | 294,962,216.95 | 182 | ”” | ”” | ”” | 2026-09-11 | 2027-03-12 | — | 3% | 17.6% | 0% | 0.00 | 50.81 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | Yes | Yes | Yes | No | No | — | — | — | — | — | — | — | ”” |
| 141 | RDA/DRP/EAS/TRI/TRI/06 | 74 | 7 | Rehabilitation / Improvement of Trincomalee - Pulmoddai Road (47+500 - 49+500) | ”” | ”” | - | Rehabilitation / Improvement of Trincomalee - Pulmoddai Road (47+500 - 49+500) | Eastern Province | Trincomalee | ”” | ”” | Southern Group Civil Construction (Pvt) Ltd | Awarded | ”” | 2022-04-22 | 131,314,798.09 | 138,997,580.74 | 182 | ”” | ”” | ”” | 2026-05-06 | 2026-11-02 | — | 20% | 100% | 0% | 0.00 | 131.31 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | No | — | Yes | Yes | Yes | Yes | No | — | — | — | — | — | — | — | ”” |
| 142 | RDA/DRP/EAS/TRI/TRI/07 | 75 | 7 | Rehabilitation / Improvement of Retaining Walls of Bridges at Upparu, Ralkuli, and Gangai | ”” | ”” | - | Rehabilitation / Improvement of Retaining Walls of Bridges at Upparu, Ralkuli, and Gangai | Eastern Province | Trincomalee | ”” | ”” | Nathans Construction | Awarded | ”” | 2026-04-22 | 85,089,780.29 | 99,606,470.35 | 182 | ”” | ”” | ”” | 2026-05-06 | 2026-11-02 | — | 82% | 100% | 0% | 0.00 | 85.09 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | No | — | Yes | Yes | Yes | Yes | No | — | — | — | — | — | — | — | ”” |
| 144 | RDA/DRP/WP/COL/COL/06 | 77 | 7 | Rehabilitation / Improvement of Allen Avenue (B011) (0+000- 2+000) | ”” | ”” | Asphalt Overlaying | Rehabilitation / Improvement of Allen Avenue (B011) (0+000- 2+000) | Western Province | Colombo | Colombo | ”” | Jayasinghe Construction (Pvt) Ltd | Awarded | ”” | 2026-04-22 | 144,822,585.09 | 146,669,652.60 | 91 | ”” | ”” | ”” | 2026-05-10 | 2026-08-09 | — | 5% | 100% | 21.4% | 31.05 | 144.82 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 26,317,379.11 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 145 | RDA/DRP/WP/COL/COL/09 | 78 | 7 | Rehabilitation / Improvement of Koralawella Egodauyana Road (B235) section 2 (3+000 - 6+300) | ”” | ”” | Asphalt Overlaying | Rehabilitation / Improvement of Koralawella Egodauyana Road (B235) section 2 (3+000 - 6+300) | Western Province | Colombo | Colombo | ”” | Jayasinghe Construction (Pvt) Ltd | Awarded | ”” | 2026-04-22 | 155,082,468.40 | 160,664,947.64 | 91 | ”” | ”” | ”” | 2026-05-10 | 2026-08-09 | — | 5% | 100% | 21.4% | 33.25 | 155.08 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 28,174,812.44 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 146 | RDA/DRP/WP/COL/AVI/01 | 79 | 7 | Rehabilitation / Improvement and Drain and Shoulder Construction at Locations Within 38+200 - 60+950 on Colombo - Ratnapura - Wellawaya - Batticaloa Road (AA004) | ”” | ”” | Built-up drains & Shoulder construction | Rehabilitation / Improvement and Drain and Shoulder Construction at Locations Within 38+200 - 60+950 on Colombo - Ratnapura - Wellawaya - Batticaloa Road (AA004) | Western Province | Colombo | Colombo | ”” | Greenwawe Construction (Pvt) Ltd | Awarded | ”” | 2026-04-22 | 210,347,639.08 | 239,974,678.56 | 63 | ”” | ”” | ”” | 2026-05-10 | 2026-07-12 | — | 26% | 100% | 27.6% | 58.02 | 210.35 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 38,055,025.28 | 0.00 | 11,115,678.27 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 147 | RDA/DRP/UVA/BAD/BAN/18 | 80 | 7 | Rehabilitation / Improvement and Retainning Wall Construction Construction on Palugama Boralanda Haputhala Road (B353) (0+000 - 26+550), Haputale Dambatanna Road (B147) (1+700 - 1+735 RHS and 0+220 - 0+240 LHS) and Colombo Rathnapura Wellawaya Batticaloa Road (AA004) (167+750 - 213+750) | ”” | ”” | Retaining Structures and Asphalt overlay | Rehabilitation / Improvement and Retainning Wall Construction Construction on Palugama Boralanda Haputhala Road (B353) (0+000 - 26+550), Haputale Dambatanna Road (B147) (1+700 - 1+735 RHS and 0+220 - 0+240 LHS) and Colombo Rathnapura Wellawaya Batticaloa Road (AA004) (167+750 - 213+750) | Uva Province | Badulla | Badulla | ”” | Kanwel Constructions & Civil Engineering (Pvt) Ltd | Awarded | ”” | 2026-04-22 | 147,759,561.52 | 153,768,755.88 | 182 | ”” | ”” | ”” | 2026-05-06 | 2026-11-03 | — | 50% | 100% | 30.4% | 44.89 | 147.76 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 26,672,374.81 | 0.00 | 11,366,156.01 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 148 | RDA/DRP/UVA/BAD/BAN/21 | 81 | 7 | Rehabilitation / Improvement of Wellawaya - Ella - Kumbalwela (14+000-30+0000 (AA-023), Ella - Passara (B113) (0+000 -5+000) and Beragala Hali-Ela (A016) (0+000 -25+000) | ”” | ”” | Retaining Structures | Rehabilitation / Improvement of Wellawaya - Ella - Kumbalwela (14+000-30+0000 (AA-023), Ella - Passara (B113) (0+000 -5+000) and Beragala Hali-Ela (A016) (0+000 -25+000) | Uva Province | Badulla | Badulla | ”” | Suhada Enterprises | Awarded | ”” | 2026-04-22 | 321,850,877.98 | 321,810,896.40 | 182 | ”” | ”” | ”” | 2026-05-06 | 2026-11-03 | — | 56% | 100% | 23.4% | 75.36 | 321.85 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 57,001,341.44 | 0.00 | 6,863,797.06 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 149 | RDA/DRP/NCP/POL/POL/09 | 82 | 7 | Rehabilitation / Improvement and Reconstruction of Culvert No. 104/2, Construction of New Drainage At 83km, and Concrete Hard Shoulder at 83 Km on Maradankadawala - Habarana - Thirikkondiyadumadu Road (A-11) (82+110 - 82+860 (B/S) | ”” | ”” | 104/2 Culvert on MHT Reconstruction, Built up Drains & Hard Shoulder Construction | Rehabilitation / Improvement and Reconstruction of Culvert No. 104/2, Construction of New Drainage At 83km, and Concrete Hard Shoulder at 83 Km on Maradankadawala - Habarana - Thirikkondiyadumadu Road (A-11) (82+110 - 82+860 (B/S) | North Central Province | Polonnaruwa | Polonnaruwa | ”” | Abeywardhana Construction | Awarded | ”” | 2026-04-22 | 94,457,054.66 | 119,605,688.26 | 91 | ”” | ”” | ”” | 2026-06-05 | 2026-05-08 | — | 56% | 100% | 32.8% | 31.02 | 94.46 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 16,284,158.94 | 0.00 | 10,001,813.42 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 150 | RDA/DRP/SAB/RAT/EMB/08 | 83 | 7 | Rehabilitation / Improvement of Pelmadulla - Embilipitiya - Naonagama Road (AA018) (43+700-47+000) | ”” | ”” | Binder and Asphalt surfacing | Rehabilitation / Improvement of Pelmadulla - Embilipitiya - Naonagama Road (AA018) (43+700-47+000) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | Anura Construction | Awarded | ”” | 2026-04-22 | 259,436,963.35 | 286,890,596.52 | 91 | ”” | ”” | ”” | 2026-05-10 | 2026-08-09 | — | 15% | 100% | 21.3% | 55.17 | 259.44 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 46,754,356.98 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 151 | RDA/DRP/SAB/RAT/EMB/10 | 84 | 7 | Rehabilitation / Improvement of Pelmadulla - Embilipitiya - Nonagama Road (AA018) (50+500 - 53+100) & Embilipitiya - Moraketiya - Kiriibbanara - Uda Mauara Road (B549) (0+000-5+500) | ”” | ”” | Asphalt over laying, RC drain, Hard shoulder | Rehabilitation / Improvement of Pelmadulla - Embilipitiya - Nonagama Road (AA018) (50+500 - 53+100) & Embilipitiya - Moraketiya - Kiriibbanara - Uda Mauara Road (B549) (0+000-5+500) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | Kanwel Constructions & Civil Engineering (Pvt) Ltd | Awarded | ”” | 2026-04-22 | 260,776,583.43 | 271,949,863.68 | 91 | ”” | ”” | ”” | 2026-05-10 | 2026-08-11 | — | 23.7% | 100% | 26.5% | 69.09 | 260.78 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 47,155,924.26 | 0.00 | 11,394,017.64 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 152 | RDA/DRP/EAS/BAT/BAT/01 | 85 | 8 | Rehabilitation / Improvement and Surfacing from 56+900 km to 58+300km and from 58+640 km to 59+440 km on Bitticaloa - Thurukkondamadu - Trincomalee Road | ”” | ”” | - | Rehabilitation / Improvement and Surfacing from 56+900 km to 58+300km and from 58+640 km to 59+440 km on Bitticaloa - Thurukkondamadu - Trincomalee Road | Eastern Province | Batticaloa | ”” | ”” | S S K Construction | Awarded | ”” | 2026-05-11 | 113,074,919.76 | 144,552,679.21 | 91 | ”” | ”” | ”” | 2026-05-25 | 2026-08-24 | — | 70% | 100% | 47.2% | 53.42 | 113.07 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 45,270,508.37 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 153 | RDA/DRP/UVA/BAD/BAD/11 | 86 | 8 | Rehabilitation / Improvement of (1) PASSARA MADULSIMA METIGAHATENNA ROAD (18+030-26+430) | ”” | ”” | - | Rehabilitation / Improvement of (1) PASSARA MADULSIMA METIGAHATENNA ROAD (18+030-26+430) | Uva Province | Badulla | Badulla | ”” | Jayanetti Construction | Awarded | ”” | 2026-05-11 | 149,405,885.14 | 159,486,625.18 | 182 | ”” | ”” | ”” | 2026-05-25 | 2026-11-22 | — | 70% | 97.3% | 38.7% | 57.88 | 145.37 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 26,364,706.39 | 0.00 | 22,682,127.01 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 154 | RDA/DRP/UVA/BAD/BAD/09 | 87 | 8 | Rehabilitation / Improvement of (1) ELLA PASSARA ROAD (23+800-27+080) | ”” | ”” | - | Rehabilitation / Improvement of (1) ELLA PASSARA ROAD (23+800-27+080) | Uva Province | Badulla | Badulla | ”” | Nimsara Construction & Engineering (Pvt) Ltd | Awarded | ”” | 2026-05-11 | 254,650,056.89 | 257,551,081.92 | 182 | ”” | ”” | ”” | 2026-05-25 | 2026-11-22 | — | 66% | 97.3% | 21.2% | 53.97 | 247.77 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 45,740,010.34 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 155 | RDA/DRP/UVA/BAD/BAD/08 | 88 | 8 | Rehabilitation / Improvement of Dikwella Jagulla Thalpitigala Road (B100) (15+000 - 23+665) and Badulla Kandy (New Rajamawatha) Road (0+000 - 6+000) | ”” | ”” | - | Rehabilitation / Improvement of Dikwella Jagulla Thalpitigala Road (B100) (15+000 - 23+665) and Badulla Kandy (New Rajamawatha) Road (0+000 - 6+000) | Uva Province | Badulla | Badulla | ”” | SF Construction (Pvt) Ltd | Awarded | ”” | 2026-05-11 | 188,749,480.00 | 177,976,215.86 | 210 | ”” | ”” | ”” | 2026-05-25 | 2026-12-20 | — | 48.5% | 92.5% | 21.3% | 40.16 | 174.59 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 34,036,087.27 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 156 | RDA/DRP/UVA/BAD/BAD/13 | 89 | 8 | Rehabilitation / Improvement of Ella Passara Road (B113) (9+500 - 27+000) | ”” | ”” | - | Rehabilitation / Improvement of Ella Passara Road (B113) (9+500 - 27+000) | Uva Province | Badulla | Badulla | ”” | SF Construction (Pvt) Ltd | Awarded | ”” | 2026-05-11 | 290,901,643.58 | 292,073,080.75 | 182 | ”” | ”” | ”” | 2026-05-25 | 2026-11-22 | — | 66.5% | 97.3% | 21.4% | 62.20 | 283.05 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 52,711,207.93 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 157 | RDA/DRP/SAB/RAT/EMB/05 | 90 | 8 | Rehabilitation / Improvement of Pelmadulla-Embilipitiya-Nonagama Road (30+000-32+850) | ”” | ”” | 2.85 km (Wearing+ Binder), Culvert and Drain Construction | Rehabilitation / Improvement of Pelmadulla-Embilipitiya-Nonagama Road (30+000-32+850) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | Anura Construction | Awarded | ”” | 2026-05-11 | 248,600,718.52 | 272,308,017.25 | 91 | ”” | ”” | ”” | 2026-06-29 | 2026-09-28 | — | 10% | 100% | 0% | 0.00 | 248.60 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | — | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 158 | RDA/DRP/SAB/RAT/EMB/06 | 91 | 8 | Rehabilitation / Improvement of Pelmadulla - Embilipitiya-Nonagama Road (33+500-36+500) | ”” | ”” | 3 km (Wearing+ Binder), Culvert and Drain Construction | Rehabilitation / Improvement of Pelmadulla - Embilipitiya-Nonagama Road (33+500-36+500) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | Anura Construction | Awarded | ”” | 2026-05-11 | 237,998,681.32 | 258,434,888.71 | 91 | ”” | ”” | ”” | 2026-06-29 | 2026-09-28 | — | 10% | 100% | 0% | 0.00 | 238.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | — | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 159 | RDA/DRP/SAB/RAT/EMB/07 | 92 | 8 | Rehabilitation / Improvement of Pelmadulla - Embilipitiya-Nonagama Road (37+000-40+000) | ”” | ”” | 3 km (Wearing+ Binder), Drain Construction | Rehabilitation / Improvement of Pelmadulla - Embilipitiya-Nonagama Road (37+000-40+000) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | Anura Construction | Awarded | ”” | 2026-05-11 | 276,583,785.23 | 299,052,002.52 | 91 | ”” | ”” | ”” | 2026-06-29 | 2026-09-28 | — | 15% | 100% | 0% | 0.00 | 276.58 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | — | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 160 | RDA/DRP/SAB/RAT/EMB/09 | 93 | 8 | Rehabilitation / Improvement of Pelmadulla - Embilipitiya - Naonagama Road (47+100 - 50+400) | ”” | ”” | Binder and Asphalt surfacing | Rehabilitation / Improvement of Pelmadulla - Embilipitiya - Naonagama Road (47+100 - 50+400) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | Anura Construction | Awarded | ”” | 2026-05-11 | 269,913,795.48 | 290,570,516.98 | 91 | ”” | ”” | ”” | 2026-05-09 | 2026-08-28 | — | 6% | 100% | 0% | 0.00 | 269.91 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | — | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 161 | RDA/DRP/SAB/RAT/EMB/11 | 94 | 8 | Rehabilitation / Improvement of Weligepola-Hadagiriya - Kapugala (2+000-11+000) | ”” | ”” | 9 km Asphalt overlaying with 1 m widening. Culvert Nos 1 reconstruction | Rehabilitation / Improvement of Weligepola-Hadagiriya - Kapugala (2+000-11+000) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | D K S Construction | Awarded | ”” | 2026-05-11 | 273,586,576.22 | 328,908,478.03 | 91 | ”” | ”” | ”” | 2026-07-01 | 2026-09-30 | — | 42% | 100% | 21.2% | 58.10 | 273.59 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 49,239,013.94 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 163 | RDA/DRP/WP/COL/COL/07 | 96 | 8 | Rehabilitation / Improvement of Colombo Hanwella Road (0+370 - 20+400) | ”” | ”” | Asphalt Overlaying, Culvert construction & Builtup darins | Rehabilitation / Improvement of Colombo Hanwella Road (0+370 - 20+400) | Western Province | Colombo | Colombo | ”” | INK Engineering | Awarded | ”” | 2026-05-11 | 146,665,907.47 | 140,313,104.48 | 91 | ”” | ”” | ”” | 2026-05-25 | 2026-08-24 | — | 12% | 100% | 4.4% | 6.46 | 146.67 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 5,477,974.44 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 164 | RDA/DRP/EAS/TRI/TRI/03 | 98 | 9 | Rehabilitation / Improvement of Town & Gravets Road (B140) (Fort Fredrick Road) (0+020 - 0+210) | ”” | ”” | - | Rehabilitation / Improvement of Town & Gravets Road (B140) (Fort Fredrick Road) (0+020 - 0+210) | Eastern Province | Trincomalee | ”” | ”” | Motec Engineering & Construction | Awarded | ”” | 2026-05-19 | 37,828,051.78 | 42,948,657.31 | 182 | ”” | ”” | ”” | 2026-06-02 | 2026-12-01 | — | 40% | 95.3% | 47.4% | 17.94 | 36.05 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 15,201,592.38 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 165 | RDA/DRP/EAS/TRI/TRI/04 | 99 | 9 | Rehabilitation / Improvement of Town & Gravets Road (B140) (Inner Harbour Road) (0+200 - 0+560) | ”” | ”” | - | Rehabilitation / Improvement of Town & Gravets Road (B140) (Inner Harbour Road) (0+200 - 0+560) | Eastern Province | Trincomalee | ”” | ”” | Motec Engineering & Construction | Awarded | ”” | 2026-05-20 | 40,407,339.17 | 45,878,059.68 | 63 | ”” | ”” | ”” | 2026-06-02 | 2026-08-04 | — | 65% | 100% | 0% | 0.00 | 40.41 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | No | — | Yes | Yes | Yes | Yes | No | — | — | — | — | — | — | — | ”” |
| 166 | RDA/DRP/NWP/KURU/MAHO/06R | 100 | 15 | Rehabilitation / Improvement of Kadigawa Bridge Approaches on Pahala Mawathagama - Kadigawa Road (0+000-0+175) | ”” | ”” | - | Rehabilitation / Improvement of Kadigawa Bridge Approaches on Pahala Mawathagama - Kadigawa Road (0+000-0+175) | North Western Province | Kurunegala | ”” | ”” | RCDC Construction Company (Pvt) Ltd | Awarded | ”” | — | 75,025,358.95 | 60,148,814.16 | 91 | ”” | ”” | ”” | 2026-10-07 | 2027-02-09 | — | 6% | 28% | 0% | 0.00 | 21.01 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | Yes | Yes | Yes | No | No | — | — | — | — | — | — | — | ”” |
| 167 | RDA/DRP/NWP/CHI/CHI/08 | 101 | 9 | Rehabilitation / Improvement of Baththuluoya - Udappuwa - Andimunai Road (B614) at 6+100 in Chilaw EE Division | ”” | ”” | Slope protection for embankement, const. of hard shoulder, Construction of U drains | Rehabilitation / Improvement of Baththuluoya - Udappuwa - Andimunai Road (B614) at 6+100 in Chilaw EE Division | North Western Province | Puttalam | Chilaw | ”” | ST MARY Construction | Awarded | ”” | 2026-05-20 | 83,944,711.21 | 84,197,870.47 | 63 | ”” | ”” | ”” | 2026-06-12 | 2026-08-15 | — | 56% | 100% | 21.4% | 17.97 | 83.94 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 15,224,674.76 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 168 | RDA/DPR/NCP/ANU/ANU/01 | 102 | 9 | Rehabilitation / Improvement of Andarawewa - Balaluwewa Road (B501) (21+330 - 21+ 580 km) | ”” | ”” | Construction and remedying of the Andarawewa - Balaluwewa Road | Rehabilitation / Improvement of Andarawewa - Balaluwewa Road (B501) (21+330 - 21+ 580 km) | North Central Province | Anuradhapura | Anuradhapura | ”” | Ranuja Construction | Awarded | ”” | — | 99,497,834.48 | 85,106,787.10 | 91 | ”” | ”” | ”” | 2026-07-23 | 2026-10-22 | — | 16% | 100% | 0% | 0.00 | 99.50 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | No | — | Yes | Yes | Yes | Yes | No | — | — | — | — | — | — | — | ”” |
| 169 | RDA/DRP/NCP/POL/HAB/04 | 103 | 9 | Rehabilitation / Improvement of washed out section between 30/1 & 30/2 Bridges on Dambulla - Bakamoona - Kalagahawela Road (B-615) & at 27/5 Bridge (26+500-27+000) on Naula - Elahera - Pallegama -Hettipola Road (B-312) | ”” | ”” | 104/2 Culvert on MHT Reconstruction, Built up Drains & Hard Shoulder Construction | Rehabilitation / Improvement of washed out section between 30/1 & 30/2 Bridges on Dambulla - Bakamoona - Kalagahawela Road (B-615) & at 27/5 Bridge (26+500-27+000) on Naula - Elahera - Pallegama -Hettipola Road (B-312) | North Central Province | Polonnaruwa | Polonnaruwa | ”” | Lahiru Construction and Consultants (Pvt) Ltd | Awarded | ”” | 2026-05-20 | 49,203,550.22 | 51,855,122.27 | 91 | ”” | ”” | ”” | 2026-02-06 | 2026-01-09 | — | 90% | 100% | 0% | 0.00 | 49.20 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | Yes | Yes | Yes | Yes | No | — | — | — | — | — | — | — | ”” |
| 170 | RDA/DRP/NCP/ANU/MAR/05R | 104 | 13 | Rehabilitation / Improvement and Rectification of Flood Damage on Thonigala - Kalawewa - Galewela Road (B423) (14+000-14+085 km) & Rectification of Flood Damage on Madatugama Pubbogama Andiyagala Road (B556) (11+930 -12+250 km) | ”” | ”” | - | Rehabilitation / Improvement and Rectification of Flood Damage on Thonigala - Kalawewa - Galewela Road (B423) (14+000-14+085 km) & Rectification of Flood Damage on Madatugama Pubbogama Andiyagala Road (B556) (11+930 -12+250 km) | North Central Province | Anuradhapura | Anuradhapura | ”” | NMST Contractors | Awarded | ”” | 2026-08-14 | 89,094,024.31 | 93,874,634.26 | 91 | ”” | ”” | ”” | 2026-08-28 | 2026-11-27 | — | 12% | 80.3% | 0% | 0.00 | 71.54 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | Yes | Yes | Yes | No | No | — | — | — | — | — | — | — | ”” |
| 171 | RDA/DRP/NCP/ANU/MAR/06 | 105 | 9 | Rehabilitation / Improvement and Retaining wall Construction of bridge No. 3/1 & Gabion wall Construction on Madatugama Pubbogama Andiyagala Road (B-556) (1+900km) RHS | ”” | ”” | Construction at Bridge no.3/1 & Gabion wall Construction | Rehabilitation / Improvement and Retaining wall Construction of bridge No. 3/1 & Gabion wall Construction on Madatugama Pubbogama Andiyagala Road (B-556) (1+900km) RHS | North Central Province | Anuradhapura | Anuradhapura | ”” | W.M.B. Contractors & Transporter | Awarded | ”” | 2026-06-16 | 112,693,093.11 | 91,709,767.42 | 91 | ”” | ”” | ”” | 2026-06-30 | 2026-09-29 | — | 90% | 100% | 36.1% | 40.73 | 112.69 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 28,343,103.08 | 0.00 | 6,175,897.38 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 172 | RDA/DRP/NCP/ANU/MED/07 | 106 | 9 | Rehabilitation / Improvement of Flood Damaged - Shoulder & Embankment Protection for Puttalam - Trincomalee Road (AA012) (131+100-131+400 LHS/RHS) (139+020-139+100 LHS) , Kandy -Jaffna Road (AA009) ( 148+775-149+050) and Kebithigollewa - Padaviya Road (B211) (17+400-17+550) | ”” | ”” | Improvement of flood Damaged - Shoulder & Embankment Protection | Rehabilitation / Improvement of Flood Damaged - Shoulder & Embankment Protection for Puttalam - Trincomalee Road (AA012) (131+100-131+400 LHS/RHS) (139+020-139+100 LHS) , Kandy -Jaffna Road (AA009) ( 148+775-149+050) and Kebithigollewa - Padaviya Road (B211) (17+400-17+550) | North Central Province | Anuradhapura | Anuradhapura | ”” | The Crown Construction | Awarded | ”” | 2026-05-19 | 38,223,285.38 | 45,054,035.76 | 91 | ”” | ”” | ”” | 2026-02-06 | 2026-01-09 | — | 47% | 100% | 0% | 0.00 | 38.22 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | Yes | Yes | Yes | Yes | No | — | — | — | — | — | — | — | ”” |
| 173 | RDA/DRP/SAB/RAT/PEL/17 | 107 | 9 | Rehabilitation / Improvement of Balangoda - Bowatta -Kalthota Road (B038) (24+000-26+000) | ”” | ”” | - | Rehabilitation / Improvement of Balangoda - Bowatta -Kalthota Road (B038) (24+000-26+000) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | DKS Nishantha Construction | Awarded | ”” | 2026-05-20 | 92,061,086.61 | 101,146,022.11 | 91 | ”” | ”” | ”” | 2026-06-12 | 2026-09-12 | — | 60% | 100% | 20.8% | 19.17 | 92.06 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 16,248,379.38 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 174 | RDA/DRP/SAB/RAT/RAT/23 | 108 | 9 | Rehabilitation / Improvement Construction of Retaining structures on Thiruwanaketiya Agalawatta Road (B421) (27/7-27/8) (27/8-27-9) (29/2-29/3) and Kalawana Deepdeen Rakwana Road (B181) (7 km) | ”” | ”” | 4 gabion walls construction | Rehabilitation / Improvement Construction of Retaining structures on Thiruwanaketiya Agalawatta Road (B421) (27/7-27/8) (27/8-27-9) (29/2-29/3) and Kalawana Deepdeen Rakwana Road (B181) (7 km) | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | AKC Construction | Awarded | ”” | 2026-05-19 | 52,340,066.90 | 59,067,809.52 | 182 | ”” | ”” | ”” | 2026-06-12 | 2026-12-11 | — | 45% | 92.2% | 21% | 10.99 | 48.26 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 9,310,375.80 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 175 | RDA/DRP/NWP/CHI/CHI/07 | 109 | 10 | Rehabilitation / Improvement of Nainamadama – Iranavila - Chilaw Road (B640) (6+200 - 32+200), Bangadeniya - Adigama – Anamaduwa Road (B045) (2+200 - 13+400) and Peliyagoda - Puttala Road (A003) (78+100 - 93+200) in Chilaw EE Division | ”” | ”” | - | Rehabilitation / Improvement of Nainamadama – Iranavila - Chilaw Road (B640) (6+200 - 32+200), Bangadeniya - Adigama – Anamaduwa Road (B045) (2+200 - 13+400) and Peliyagoda - Puttala Road (A003) (78+100 - 93+200) in Chilaw EE Division | North Western Province | Puttalam | Chilaw | ”” | Jayawansa Construction (Pvt) Ltd | Awarded | ”” | 2026-08-07 | 214,608,362.18 | 248,319,499.59 | 182 | ”” | ”” | ”” | 2026-07-22 | 2027-01-20 | — | 28% | 65.3% | 21% | 44.99 | 140.14 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 38,125,702.21 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 176 | RDA/DRP/NWP/CHI/PUT/09R | 110 | 15 | Rehabilitation / Improvement of Peliyagoda Puttalam Road ((A003)) (95+000 - 97+000), Slope Protection by Concrete on Anamaduwa Uswewa Galgamauwa Road (B019) and Slope Protection by Concrete on Kiriyankalli Andigama Road (B227) | ”” | ”” | Construction of U drains | Rehabilitation / Improvement of Peliyagoda Puttalam Road ((A003)) (95+000 - 97+000), Slope Protection by Concrete on Anamaduwa Uswewa Galgamauwa Road (B019) and Slope Protection by Concrete on Kiriyankalli Andigama Road (B227) | North Western Province | Puttalam | Chilaw | ”” | RCDC Construction Company (Pvt) Ltd | Awarded | ”” | — | 219,322,470.61 | 160,051,970.56 | 182 | ”” | ”” | ”” | 2026-09-29 | 2027-03-29 | — | 5% | 8.2% | 0% | 0.00 | 17.98 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | Yes | Yes | Yes | No | No | — | — | — | — | — | — | — | ”” |
| 177 | RDA/DRP/NWP/CHI/PUT/10 | 111 | 10 | Rehabilitation / Improvement of Palavi - Kalpitiya Road (B349) and Etalai - Talawila (Jubily Mawatha) Road (B516) (0+900-1+200) Puttalam EE Division | ”” | ”” | Construction of U drains | Rehabilitation / Improvement of Palavi - Kalpitiya Road (B349) and Etalai - Talawila (Jubily Mawatha) Road (B516) (0+900-1+200) Puttalam EE Division | North Western Province | Puttalam | Chilaw | ”” | ST MARY Construction | Awarded | ”” | 2026-05-19 | 136,011,633.11 | 147,930,527.03 | 182 | ”” | ”” | ”” | 2026-06-02 | 2026-12-01 | — | 14% | 95.3% | 20.2% | 27.43 | 129.62 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 23,243,388.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 178 | RDA/DRP/NWP/CHI/PUT/11 | 112 | 10 | Rehabilitation / Improvement of Town Roads (Saltern Road, Marikkar Street, Poles Road, Rest House Road, Good Shed Road) and Puttalam Trincomalee Road (AA012) in Puttalam EE Division | ”” | ”” | Slope protection by concreting, const. of drainage, culverts | Rehabilitation / Improvement of Town Roads (Saltern Road, Marikkar Street, Poles Road, Rest House Road, Good Shed Road) and Puttalam Trincomalee Road (AA012) in Puttalam EE Division | North Western Province | Puttalam | Chilaw | ”” | Omega Construction Company (Pvt) Ltd | Awarded | ”” | 2026-05-19 | 303,043,337.30 | 290,051,718.48 | 182 | ”” | ”” | ”” | 2026-06-02 | 2026-12-01 | — | 35% | 95.3% | 0% | 0.00 | 288.80 | 64.62 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 0.00 | 54,762,788.60 | 0.00 | 0.00 | Yes | Yes | Yes | — | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 179 | RDA/DRP/UVA/BAD/BAN/20 | 114 | 10 | Rehabilitation / Improvement of Bandarawela - Liyangahawela - Poonagala Road (B042) (10+000 -15+000) | ”” | ”” | - | Rehabilitation / Improvement of Bandarawela - Liyangahawela - Poonagala Road (B042) (10+000 -15+000) | Uva Province | Badulla | ”” | ”” | D K S Construction | Awarded | ”” | 2026-05-19 | 283,401,035.13 | 301,203,263.92 | 119 | ”” | ”” | ”” | 2026-06-20 | 2026-10-17 | — | 44.5% | 100% | 21.4% | 60.53 | 283.40 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 51,293,460.90 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 180 | RDA/DRP/NCP/POL/POL/08 | 119 | 10 | Rehabilitation / Improvement and Reconstruction of 31/1 Culvert, Construction Of Retaining Walls At 31/2 (RHS) on Manampitiya Aralaganwila Maduruoya Road | ”” | ”” | Reconstruction of 31/1 Culvert, Construction Of Retaining Walls At 31/2 (RHS) on Manampitiya Aralaganwila Maduruoya Road | Rehabilitation / Improvement and Reconstruction of 31/1 Culvert, Construction Of Retaining Walls At 31/2 (RHS) on Manampitiya Aralaganwila Maduruoya Road | North Central Province | Polonnaruwa | Polonnaruwa | ”” | Sawsiri Construction | Awarded | ”” | 2026-05-19 | 17,459,311.37 | 17,399,611.61 | 91 | ”” | ”” | ”” | 2026-02-06 | 2026-01-09 | — | 100% | 100% | 66.7% | 11.64 | 17.46 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 9,866,233.21 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 181 | RDA/DRP/NCP/POL/POL/10 | 120 | 10 | Rehabilitation / Improvement and Construction of New Drainage At 65-78km on Maradankadawala Habarana Thirikkondiyadumadu Road (A011)Road | ”” | ”” | Construction of New Drainage At 65-78km on Maradankadawala Habarana Thirikkondiyadumadu Road (A011)Road | Rehabilitation / Improvement and Construction of New Drainage At 65-78km on Maradankadawala Habarana Thirikkondiyadumadu Road (A011)Road | North Central Province | Polonnaruwa | Polonnaruwa | ”” | A.D.M Construction | Awarded | ”” | 2026-05-19 | 29,767,050.53 | 33,973,362.07 | 91 | ”” | ”” | ”” | 2026-02-06 | 2026-01-09 | — | 55% | 100% | 43.9% | 13.06 | 29.77 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 4,266,131.96 | 0.00 | 6,804,713.26 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 182 | RDA/DRP/UVA/BAD/BAN/24 | 121 | 11 | Rehabilitation / Improvement of Rendapola Ambewela Road | ”” | ”” | - | Rehabilitation / Improvement of Rendapola Ambewela Road | Uva Province | Badulla | ”” | ”” | Gamage Builders | Awarded | ”” | 2026-05-29 | 290,409,872.96 | 271,955,137.78 | 182 | ”” | ”” | ”” | 2026-07-01 | 2026-12-30 | — | 36% | 82.4% | 21.2% | 61.67 | 239.30 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 52,259,795.07 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 183 | RDA/DRP/EAS/AMP/AMP/01 | 125 | 11 | Rehabilitation / Improvement of Ampara Uhana Mahoya Road (from 2+400 to 2+800) & (from 3+700 to 3+900), Siyambalanduwa Damana Ampara Road (from 43+000 to 45+000), (from 33+000 to 34+000), (from 35+500 to 36+500) & (from 52+000 to 53+000) and Chadayanthalawa Uhana Road (from 11+100 to 11+500) | ”” | ”” | Construction of Hard Shoulder (Concrete) and Retaining Wall | Rehabilitation / Improvement of Ampara Uhana Mahoya Road (from 2+400 to 2+800) & (from 3+700 to 3+900), Siyambalanduwa Damana Ampara Road (from 43+000 to 45+000), (from 33+000 to 34+000), (from 35+500 to 36+500) & (from 52+000 to 53+000) and Chadayanthalawa Uhana Road (from 11+100 to 11+500) | Eastern Province | Ampara | ”” | ”” | Ediriweera Construction | Awarded | ”” | 2026-05-29 | 27,878,955.02 | 31,793,559.86 | 91 | ”” | ”” | ”” | 2026-06-12 | 2026-09-10 | — | 90% | 100% | 21.3% | 5.95 | 27.88 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 5,042,900.91 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 184 | RDA/DRP/EAS/AKK/AKK/04 | 126 | 11 | Rehabilitation / Improvement of Newguna – Manikkamadu – Irakkamam Road (0+000-1+250) & (1+300-2+600), Akkaraipattu Degavapi Vangamam Road (8+500-21+500) and Reconstruction of Culvert No. 368/2 on Colombo-Ratnapura-Wellawaya-Batticaloa Road | ”” | ”” | Construction of Drain & lead away, Concrete Surface, Hard Shoulder-Concrete and Culvert | Rehabilitation / Improvement of Newguna – Manikkamadu – Irakkamam Road (0+000-1+250) & (1+300-2+600), Akkaraipattu Degavapi Vangamam Road (8+500-21+500) and Reconstruction of Culvert No. 368/2 on Colombo-Ratnapura-Wellawaya-Batticaloa Road | Eastern Province | Ampara | ”” | ”” | Jeezan Trading and Transport | Awarded | ”” | 2026-05-29 | 171,572,395.05 | 196,038,211.02 | 182 | ”” | ”” | ”” | 2026-06-12 | 2026-12-10 | — | 29% | 92.2% | 10.6% | 18.24 | 158.19 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 15,455,490.46 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 185 | RDA/DRP/EAS/AKK/KAL/05 | 127 | 11 | Rehabilitation / Improvement and Reconstruction of Box Culvert at 9+780, Construction of Mass Concrete Retaining Wall (9+550 -9+600) & (9+600-11+000) on Sammanthurai - Malkampiddi - Deegawapi Road, Construction of Concrete Drain & rock blasting with utility shifting on Varaipathanchenai - Deegawapi Road (0+880 - 0+980 RHS), Construction of Concrete Drain on Deegawapi Temple Road (1+100 1+230 RHS), Construction of Mass Concete Retaining wall on Ampilanthurai - Veeramunai Road (25+600 - 26+000 LHS & RHS), Reconstruction of Wing Walls (at 375/2, 375/3, 375/4, 375/6) & Construction of Concrete Drain (384+000-389+000) on Colombo Ratnepura Wellawaya Batticoala Road, Construction of Concrete Drain (15+400 - 15+550 LHS) on Karaitivu - Ampara Road, Construction of Mass Concete Retaining Wall (5+700 -5+730) & on Construction of Hard Shoulder (Concrete) (13+200 - 13+600 LHS & RHS Selected Section) on Weeragoda - Central Camp Road, Construction of Hard Shoulder (Concete) (0+600 - 0+800 LHS & RHS) on Approach Road to Public Buildings | ”” | ”” | Construction of Hard Shoulder (Concrete), U drain, Concrete Surface and Box Culvert | Rehabilitation / Improvement and Reconstruction of Box Culvert at 9+780, Construction of Mass Concrete Retaining Wall (9+550 -9+600) & (9+600-11+000) on Sammanthurai - Malkampiddi - Deegawapi Road, Construction of Concrete Drain & rock blasting with utility shifting on Varaipathanchenai - Deegawapi Road (0+880 - 0+980 RHS), Construction of Concrete Drain on Deegawapi Temple Road (1+100 1+230 RHS), Construction of Mass Concete Retaining wall on Ampilanthurai - Veeramunai Road (25+600 - 26+000 LHS & RHS), Reconstruction of Wing Walls (at 375/2, 375/3, 375/4, 375/6) & Construction of Concrete Drain (384+000-389+000) on Colombo Ratnepura Wellawaya Batticoala Road, Construction of Concrete Drain (15+400 - 15+550 LHS) on Karaitivu - Ampara Road, Construction of Mass Concete Retaining Wall (5+700 -5+730) & on Construction of Hard Shoulder (Concrete) (13+200 - 13+600 LHS & RHS Selected Section) on Weeragoda - Central Camp Road, Construction of Hard Shoulder (Concete) (0+600 - 0+800 LHS & RHS) on Approach Road to Public Buildings | Eastern Province | Ampara | ”” | ”” | Nazeeha Hardware and Construction | Awarded | ”” | 2026-05-29 | 196,448,155.48 | 236,184,712.99 | 182 | ”” | ”” | ”” | 2026-06-12 | 2026-12-10 | — | 23% | 92.2% | 0% | 0.00 | 181.13 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | No | — | Yes | Yes | Yes | Yes | No | — | — | — | — | — | — | — | ”” |
| 186 | RDA/DRP/NWP/CHI/PUT/12 | 128 | 11 | Rehabilitation / Improvement of Puttalam Marichchikaddi Road in Puttalam 6+100-9+000 | ”” | ”” | Construcion of culverts and U drains | Rehabilitation / Improvement of Puttalam Marichchikaddi Road in Puttalam 6+100-9+000 | North Western Province | Puttalam | Chilaw | ”” | Omega Construction Company (Pvt) Ltd | Awarded | ”” | 2026-05-29 | 141,404,654.67 | 143,347,737.52 | 182 | ”” | ”” | ”” | 2026-06-18 | 2026-12-17 | — | 26% | 89.7% | 0% | 0.00 | 126.84 | 30.09 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 0.00 | 25,503,937.21 | 0.00 | 0.00 | Yes | Yes | Yes | — | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 187 | RDA/DRP/WP/GAM/GAM/13 | 129 | 11 | Rehabilitation / Improvement and Culvert Constructions on Aluthgama- Vigoda Road at 1+650, on Katunayake - Veyangoda Road at 15+940, on Minuwangoda - Miriswatta - Katana Road at 3+700, on Dunagaha- Nilpanagoda Road at 4+900, on Kadawatha - Mawaramandiya Road at 2+800 and on Makola - Udupila Road at 3+200 | ”” | ”” | Culvert reconstruction | Rehabilitation / Improvement and Culvert Constructions on Aluthgama- Vigoda Road at 1+650, on Katunayake - Veyangoda Road at 15+940, on Minuwangoda - Miriswatta - Katana Road at 3+700, on Dunagaha- Nilpanagoda Road at 4+900, on Kadawatha - Mawaramandiya Road at 2+800 and on Makola - Udupila Road at 3+200 | Western Province | Gampaha | Gampaha | ”” | Venus Enterprise | Awarded | ”” | 2026-05-29 | 34,489,854.85 | 39,535,250.16 | 91 | ”” | ”” | ”” | 2026-06-18 | 2026-09-17 | — | 60% | 100% | 0% | 0.00 | 34.49 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | No | — | Yes | Yes | Yes | Yes | No | — | — | — | — | — | — | — | ”” |
| 189 | RDA/DRP/NCP/POL/POL/11 | 131 | 11 | Rehabilitation / Improvement and Construction of New Drainage on Polonnaruwa-Thambala -Sungawila -Somawathiya- Road | ”” | ”” | Construction of New Drainage on Polonnaruwa-Thambala -Sungawila -Somawathiya- Road | Rehabilitation / Improvement and Construction of New Drainage on Polonnaruwa-Thambala -Sungawila -Somawathiya- Road | North Central Province | Polonnaruwa | Polonnaruwa | ”” | A.D.M Construction | Awarded | ”” | — | 44,474,738.82 | 57,461,708.21 | 91 | ”” | ”” | ”” | 2026-07-12 | 2026-09-11 | — | 40% | 100% | 20.1% | 8.95 | 44.47 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 7,582,108.44 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 190 | RDA/DRP/SAB/RAT/PEL/18 | 132 | 11 | Rehabilitation / Improvement of Oluganthota - Pinnawala - Bagawanthalawa (26+000-30+000) & Retaining wall construction (Oluganthota - Pinnawala - Bagawanthalawa Road 26/1-26/2 LHS | ”” | ”” | - | Rehabilitation / Improvement of Oluganthota - Pinnawala - Bagawanthalawa (26+000-30+000) & Retaining wall construction (Oluganthota - Pinnawala - Bagawanthalawa Road 26/1-26/2 LHS | Sabaragamuwa Province | Ratnapura | Ratnapura | ”” | Anura Construction | Awarded | ”” | — | 169,799,736.07 | 152,227,214.62 | 91 | ”” | ”” | ”” | 2026-08-13 | 2026-12-11 | — | 0% | 94.9% | 0% | 0.00 | 161.14 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | — | — | — | Yes | No | — | — | — | — | — | — | — | ”” |
| 191 | RDA/DRP/UVA/BAD/BAN/23 | 142 | 12 | Rehabilitation / Improvement of Colombo Rathnapura Wellawaya Batticaloa Road (AA004) (201+000 - 204+000) | ”” | ”” | - | Rehabilitation / Improvement of Colombo Rathnapura Wellawaya Batticaloa Road (AA004) (201+000 - 204+000) | Uva Province | Badulla | ”” | ”” | D K S Construction | Awarded | ”” | 2026-06-16 | 322,192,938.69 | 325,833,013.16 | 182 | ”” | ”” | ”” | 2026-07-03 | 2027-01-07 | — | 21% | 81.1% | 21.3% | 68.55 | 261.30 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | Yes | 58,090,759.31 | 0.00 | 0.00 | 0.00 | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | — | — | — | — | — | — | — | ”” |
| 192 | RDA/DRP/SP/GAL/GAL/02 | 143 | 12 | Rehabilitation of Gabbion Walls along Galle - Deniyaya - Madampe Road (from7+700-7+730) | ”” | ”” | - | Rehabilitation of Gabbion Walls along Galle - Deniyaya - Madampe Road (from7+700-7+730) | Southern Province | Galle | Galle | ”” | Ceylon Construction Industry Development (Pvt) Ltd | Awarded | ”” | 2026-06-16 | 8,991,852.34 | 10,402,707.85 | 63 | ”” | ”” | ”” | 2026-07-06 | 2026-09-07 | — | 100% | 100% | 0% | 0.00 | 8.99 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | No | — | Yes | Yes | Yes | Yes | No | — | — | — | — | — | — | — | ”” |
| 193 | RDA/DRP/SP/GAL/HIN/03 | 144 | 12 | Rehabilitation / Improvement of Gabbion Walls along Udugama - Hiniduma (9+920- 9+938-LHS), (7+450-7+472-LHS), (5+150-5+17 LHS) | ”” | ”” | - | Rehabilitation / Improvement of Gabbion Walls along Udugama - Hiniduma (9+920- 9+938-LHS), (7+450-7+472-LHS), (5+150-5+17 LHS) | Southern Province | Galle | Galle | ”” | Ceylon Construction Industry Development (Pvt) Ltd | Awarded | ”” | 2026-06-15 | 19,453,314.54 | 22,102,879.06 | 91 | ”” | ”” | ”” | 2026-07-06 | 2026-10-05 | — | 98% | 100% | 0% | 0.00 | 19.45 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | Yes | No | — | Yes | Yes | Yes | Yes | No | — | — | — | — | — | — | — | ”” |
| 194 | RDA/DRP/UVA/BAD/BAN/31 | 149 | 13 | Rehabilitation / Improvement of Colombo Rathnapura Wellawaya Batticaloa Road (AA004) (212+000 - 213+500) | ”” | ”” | - | Rehabilitation / Improvement of Colombo Rathnapura Wellawaya Batticaloa Road (AA004) (212+000 - 213+500) | Uva Province | Badulla | ”” | ”” | Nimna Holdings (Pvt) Ltd | Awarded | ”” | — | 239,935,072.90 | 232,794,296.45 | 182 | ”” | ”” | ”” | 2026-09-04 | 2027-03-05 | — | 16% | 22.5% | 0% | 0.00 | 53.99 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | Yes | Yes | Yes | Yes | No | — | — | — | — | — | — | — | ”” |
| 195 | RDA/DRP/NOR/MUL/KIL/07 | 150 | 13 | Rehabilitation / Improvement of Sholder of 1. Kandy - Jaffna Road (251+000 - 252+200), 2.0Kandy - Jaffna Road (260+000 - 270+000), 3.Nawatkuly - Kerativu - Mannar Road(54+000 - 57+000), 4.Paranthan - Karachchi - Mullaitivu (0+000 - 1+000, 6+000- 8+000, 9+000-11+000, 12+500-14+500, 16+000-17+500, 19+400-19+800) 5.Paranthan - Ponakary Road (9+000-16+000) 6.Soranpattu - Thalaiyadi road (2+500-5+000) | ”” | ”” | - | Rehabilitation / Improvement of Sholder of 1. Kandy - Jaffna Road (251+000 - 252+200), 2.0Kandy - Jaffna Road (260+000 - 270+000), 3.Nawatkuly - Kerativu - Mannar Road(54+000 - 57+000), 4.Paranthan - Karachchi - Mullaitivu (0+000 - 1+000, 6+000- 8+000, 9+000-11+000, 12+500-14+500, 16+000-17+500, 19+400-19+800) 5.Paranthan - Ponakary Road (9+000-16+000) 6.Soranpattu - Thalaiyadi road (2+500-5+000) | Northern Province | Kilinochchi | ”” | ”” | SSK Construction | Awarded | ”” | — | 62,162,612.70 | 55,617,040.01 | 91 | ”” | ”” | ”” | 2026-09-07 | 2026-12-07 | — | 7% | 68.2% | 0% | 0.00 | 42.39 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | Yes | Yes | Yes | No | No | — | — | — | — | — | — | — | ”” |
| 196 | RDA/DRP/NOR/VOU/MAN/08 | 151 | 13 | Rehabilitation / Improvement of 85/3 Bridge Approach Reconstruction with Gabion Walls & Damaged Shoulder Construction in between Ch (65+500-79+150km) and Reconstruction of Embankment, shoulder & Improvement to Concrete Shoulder on Navatkuli-Kerativu-Mannar Road (AA032) | ”” | ”” | - | Rehabilitation / Improvement of 85/3 Bridge Approach Reconstruction with Gabion Walls & Damaged Shoulder Construction in between Ch (65+500-79+150km) and Reconstruction of Embankment, shoulder & Improvement to Concrete Shoulder on Navatkuli-Kerativu-Mannar Road (AA032) | Northern Province | Mannar | ”” | ”” | Asset Engineering (Pvt) Ltd | Awarded | ”” | — | 98,477,554.94 | 86,662,670.95 | 119 | ”” | ”” | ”” | 2026-08-27 | 2026-12-23 | — | 10% | 62.5% | 0% | 0.00 | 61.55 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | Yes | Yes | Yes | No | No | — | — | — | — | — | — | — | ”” |
| 197 | RDA/DRP/NOR/MUL/MUL/09 | 152 | 13 | Rehabilitation /Improvement & Rectification of flood damages in Mullaitivu ( Mankulam-Mullaitivu Road (AA034), Mankulam-Vellankulam Road (B269), Mullaitivu-Kokkilai Road (B297), Kandy-Jaffna Road (AA009), Paranthan-Karachchi-Mullaitivu Road (AA035)) | ”” | ”” | - | Rehabilitation /Improvement & Rectification of flood damages in Mullaitivu ( Mankulam-Mullaitivu Road (AA034), Mankulam-Vellankulam Road (B269), Mullaitivu-Kokkilai Road (B297), Kandy-Jaffna Road (AA009), Paranthan-Karachchi-Mullaitivu Road (AA035)) | Northern Province | Mullaitivu | Mullaitivu | ”” | Jana Civil Work Contractors & Material Suppliers | Awarded | ”” | — | 37,338,982.74 | 50,474,039.90 | 91 | ”” | ”” | ”” | 2026-08-27 | 2026-11-25 | — | 12% | 81.5% | 0% | 0.00 | 30.43 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | Yes | Yes | Yes | No | No | — | — | — | — | — | — | — | ”” |
| 198 | RDA/DRP/NOR/VOU/VOU/15 | 153 | 13 | Rehabilitation /Improvement of Kandy-Jaffna Road (AA009) & Madawachchiya-Mannar-Thalaimannar Road (AA014) | ”” | ”” | - | Rehabilitation /Improvement of Kandy-Jaffna Road (AA009) & Madawachchiya-Mannar-Thalaimannar Road (AA014) | Northern Province | Vavuniya | Vavuniya | ”” | Jana Civil Work Contractors & Material Suppliers | Awarded | ”” | — | 42,832,926.51 | 46,307,621.71 | 119 | ”” | ”” | ”” | 2026-08-27 | 2026-12-23 | — | 19% | 62.5% | 0% | 0.00 | 26.77 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | Yes | Yes | Yes | No | No | — | — | — | — | — | — | — | ”” |
| 199 | RDA/DRP/NOR/JAF/POI/10 | 154 | 15 | REHABILITATION/IMPROVEMENT OF FLOOD DAMAGES IN CHAVAKACHCHERI-PULOLY ROAD (B075) IN BETWEEN (7+500-9+000 &10+500-12+000) | ”” | ”” | - | REHABILITATION/IMPROVEMENT OF FLOOD DAMAGES IN CHAVAKACHCHERI-PULOLY ROAD (B075) IN BETWEEN (7+500-9+000 &10+500-12+000) | Northern Province | Jaffna | Jaffna | ”” | S S K Construction | Awarded | ”” | — | 159,578,757.33 | 141,794,348.74 | 154 | ”” | ”” | ”” | 2026-10-20 | 2027-03-23 | — | 0% | 4% | 0% | 0.00 | 6.38 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | — | — | — | No | No | — | — | — | — | — | — | — | ”” |
| 200 | RDA/DRP/NOR/JAF/JAF/06 | 155 | 15 | REHABILITATION / IMPROVEMENT OF FLOOD DAMAGES IN KARAINAGAR CIRCULAR ROAD (B 197) FROM CHAINAGE (5+000-7+030) AND RECONSTRUCTION OF 3/1 CULVERT & RETAINING WALL IN KARAINAGAR CIRCULAR ROAD (B197) FROM CHAINAGE (3+700-3+800) | ”” | ”” | - | REHABILITATION / IMPROVEMENT OF FLOOD DAMAGES IN KARAINAGAR CIRCULAR ROAD (B 197) FROM CHAINAGE (5+000-7+030) AND RECONSTRUCTION OF 3/1 CULVERT & RETAINING WALL IN KARAINAGAR CIRCULAR ROAD (B197) FROM CHAINAGE (3+700-3+800) | Northern Province | Jaffna | Jaffna | ”” | Nimna Holdings (Pvt) Ltd | Awarded | ”” | 2026-10-01 | 200,137,805.22 | 160,730,920.06 | 182 | ”” | ”” | ”” | 2026-11-02 | 2027-05-03 | — | 0% | 0.3% | 0% | 0.00 | 0.60 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | — | — | — | No | No | — | — | — | — | — | — | — | ”” |
| 201 | RDA/DRP/EAS/TRI/TRI/08 | 156 | 15 | REHABILITATION/ IMPROVEMENT OF ALLAI - KANTALE(B010) ROAD, SHOULDER & RETAINING WALL CONSTRUCTION FROM CHAINAGE 24+000 TO 34+500 | ”” | ”” | - | REHABILITATION/ IMPROVEMENT OF ALLAI - KANTALE(B010) ROAD, SHOULDER & RETAINING WALL CONSTRUCTION FROM CHAINAGE 24+000 TO 34+500 | Eastern Province | Trincomalee | Trincomalee | ”” | A.D.M Construction | Awarded | ”” | — | 49,212,342.69 | 51,740,824.32 | ”” | ”” | ”” | ”” | — | — | — | 0% | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | No | No | — | — | — | — | No | No | — | — | — | — | — | — | — | ”” |
| 204 | RDA/DC/DRP/WP/GAM/NEG/11 | ”” | ”” | Rehabilitation/ Improvement - Kadawatha - Ragama - Welisara Road (3+000 - 8+050) | ”” | ”” | ”” | Rehabilitation/ Improvement - Kadawatha - Ragama - Welisara Road (3+000 - 8+050) | Western Province | Gampaha | ”” | ”” | Komuthi Engineering Services (Pvt) Ltd | Awarded | DC | 2026-10-12 | 666,616,488.15 | 470,020,000.00 | 243 | ”” | ”” | ”” | — | — | — | 0% | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 215 | RDA/DC/DRP/SLOPE/CP/MAT/MAT/PACKAGE-23 | ”” | ”” | REHABILITATION OF SELECTED ROAD SECTIONS ON KALALPITIYA UKUWELA-ELKADUWA ROAD (12th KM) AND SLOPE FAILURES DUE TO DITWAH CYCLONE -PACKAGE -23 | ”” | ”” | ”” | REHABILITATION OF SELECTED ROAD SECTIONS ON KALALPITIYA UKUWELA-ELKADUWA ROAD (12th KM) AND SLOPE FAILURES DUE TO DITWAH CYCLONE -PACKAGE -23 | Central Province | Matale | Matale | ”” | Sanguine Engineering (Pvt) Ltd | Awarded | DC | 2026-10-09 | 372,110,778.00 | 337,000,000.00 | 301 | ”” | ”” | ”” | — | — | — | 0% | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 216 | RDA/DC/DRP/SLOPE/CP/NUE/NUE/PACKAGE-31 | ”” | ”” | REHABILITATION OF SELECTED ROADSECTIONS ON PERADENIYA-BADULLA-CHENKALADI ROAD(44TH KM) AND SLOPE FAILURES DUE TO DITWAH CYCLONE | ”” | ”” | ”” | REHABILITATION OF SELECTED ROADSECTIONS ON PERADENIYA-BADULLA-CHENKALADI ROAD(44TH KM) AND SLOPE FAILURES DUE TO DITWAH CYCLONE | Central Province | Nuwara Eliya | Nuwara Eliya | ”” | Sanguine Engineering (Pvt) Ltd | Awarded | DC | 2026-10-19 | 376,649,403.13 | 320,000,000.00 | 273 | ”” | ”” | ”” | — | — | — | ”” | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 219 | RDA/DC/DRP/SLOPE/CP/KDY/KUN/PACKAGE 06A | ”” | ”” | REHABILITATION OF SELECTED ROAD SECTIONS ON KANDY-MAHIYANGANA-PADIYATHALAWA ROAD (34th & 35th KM) & MORAGAHAMULA VICTORIA DAMTOP ROAD (6TH KM) AND SLOPE FAILURES DUE TO "DITWAH" CYCLONE- PACKAGE 06A | ”” | ”” | ”” | REHABILITATION OF SELECTED ROAD SECTIONS ON KANDY-MAHIYANGANA-PADIYATHALAWA ROAD (34th & 35th KM) & MORAGAHAMULA VICTORIA DAMTOP ROAD (6TH KM) AND SLOPE FAILURES DUE TO "DITWAH" CYCLONE- PACKAGE 06A | Central Province | Kandy | Kundasale | ”” | Finex Engineering (Pvt) Ltd | Awarded | DC | 2026-10-13 | 628,900,686.30 | 614,600,000.00 | 364 | ”” | ”” | ”” | — | — | — | ”” | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 222 | RDA/DC/DRP/SLOPE/CP/NUE/NOR/PACKAGE 33 | ”” | ”” | MITIGATION FOR FAILURE LOCATIONS ALONG NORTON MASKELIYA ROAD (B328) (7+020 7+510) AND SLOPE FAILURES DUE TO "DITWAH" CYCLONE -PACKAGE 33 | ”” | ”” | ”” | MITIGATION FOR FAILURE LOCATIONS ALONG NORTON MASKELIYA ROAD (B328) (7+020 7+510) AND SLOPE FAILURES DUE TO "DITWAH" CYCLONE -PACKAGE 33 | Central Province | Nuwara Eliya | Norwood | ”” | HMA Enterprises (Pvt) Ltd | Awarded | DC | 2026-10-19 | 220,338,719.68 | 216,000,000.00 | 273 | ”” | ”” | ”” | — | — | — | ”” | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 229 | RDA/DC/DRP/SLOPE/CP/NUE/NUE/PACKAGE-03 | ”” | ”” | MITIGATION OF SLOPE FAILURE LOCATIONS ALONG GOMBURU OYA-BALAPOKUNA ROAD (B582) 6+900 KM-7+100 KM DUE TO DITWAH CYCLONE - PACKAGE 03 | ”” | ”” | ”” | MITIGATION OF SLOPE FAILURE LOCATIONS ALONG GOMBURU OYA-BALAPOKUNA ROAD (B582) 6+900 KM-7+100 KM DUE TO DITWAH CYCLONE - PACKAGE 03 | Central Province | Nuwara Eliya | Nuwara Eliya | ”” | Nagma Engineering (Pvt) Ltd | Awarded | DC | 2026-10-28 | 357,941,434.50 | 262,030,000.00 | 273 | ”” | ”” | ”” | — | — | — | ”” | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 244 | RDA/DC/DRP/SLOPE/CP/KDY/KAD/PACKAGE 14B | ”” | ”” | MITIGATION FOR FAILURE LOCATIONS ALONG NAWALAPITIYA DOLOSBAGE ROAD (B318) (15+000 - 16+000) DUE TO "DITWAH" CYCLONE - PACKAGE 14B | ”” | ”” | ”” | MITIGATION FOR FAILURE LOCATIONS ALONG NAWALAPITIYA DOLOSBAGE ROAD (B318) (15+000 - 16+000) DUE TO "DITWAH" CYCLONE - PACKAGE 14B | Central Province | Kandy | Kadugannawa | ”” | HMA Enterprises (Pvt) Ltd | Awarded | ”” | — | 139,111,261.28 | 130,000,000.00 | 273 | ”” | ”” | ”” | — | — | — | ”” | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 246 | RDA/DC/DRP/SLOPE/CP/NUE/HAN/PACKAGE 26E | ”” | ”” | REHABILITATION OF SELECTED ROAD SECTIONS ON THENNEKUMBURA RIKILLAGASKADA RAGALA ROAD (B413) (50+100-70+950 ) AND SLOPE FAILURES DUE TO "DITWAH" CYCLONE-PACKAGE 26E | ”” | ”” | ”” | REHABILITATION OF SELECTED ROAD SECTIONS ON THENNEKUMBURA RIKILLAGASKADA RAGALA ROAD (B413) (50+100-70+950 ) AND SLOPE FAILURES DUE TO "DITWAH" CYCLONE-PACKAGE 26E | Central Province | Nuwara Eliya | Hanguranketha | ”” | Nagma Engineering (Pvt) Ltd | Awarded | DC | 2026-10-28 | 332,123,863.50 | 322,400,000.00 | 273 | ”” | ”” | ”” | — | — | — | ”” | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 249 | RDA/DC/DRP/SLOPE/CP/NUE/HAN/PACKAGE 26C | ”” | ”” | MITIGATION FOR FAILURE LOCATIONS ALONG THENNEKUMBURA RIKILLAGASKADA RAGALA ROAD (B413) (48/11 - 48/12) & (67/10 - 67 km) DUE TO "DITWAH" CYCLONE-PACKAGE 26C | ”” | ”” | ”” | MITIGATION FOR FAILURE LOCATIONS ALONG THENNEKUMBURA RIKILLAGASKADA RAGALA ROAD (B413) (48/11 - 48/12) & (67/10 - 67 km) DUE TO "DITWAH" CYCLONE-PACKAGE 26C | Central Province | Nuwara Eliya | Hanguranketha | ”” | Finex Engineering (Pvt) Ltd | Awarded | ”” | 2026-10-28 | 180,175,018.14 | 159,300,000.00 | 273 | ”” | ”” | ”” | — | — | — | ”” | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
| 250 | RDA/DC/DRP/SLOPE/CP/NUE/NOR/PACKAGE 28A | ”” | ”” | MITIGATION FOR FAILURE LOCATIONS ALONG AWISSAWELLA HATTON NUWARAELIYA ROAD (A007) (41+800 & 42+960) DUE TO "DITWAH" CYCLONE - PACKAGE 28A | ”” | ”” | ”” | MITIGATION FOR FAILURE LOCATIONS ALONG AWISSAWELLA HATTON NUWARAELIYA ROAD (A007) (41+800 & 42+960) DUE TO "DITWAH" CYCLONE - PACKAGE 28A | Central Province | Nuwara Eliya | Norwood | ”” | Finex Engineering (Pvt) Ltd | Awarded | ”” | 2026-10-28 | 264,416,347.31 | 232,200,000.00 | 273 | 1 | ”” | 1.16 | — | — | — | ”” | 0% | 0% | 0.00 | 0.00 | 0.00 | ”” | ”” | ”” | ”” | ”” | ”” | ”” | No | 0.00 | 0.00 | 0.00 | 0.00 | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ”” |
No projects match the table filters Adjust the search or dropdowns above — totals below stay as view totals. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Total (266) | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 34,005,299,486.17 | 68,929,854,408.85 | — | 2 | — | 1.16 | — | — | — | 35.5% | 46.2% | 9.6% | 4,470.54 | 21,253.00 | 207.23 | 34.4% | 19.8% | 20.6% | 0.0% | 0.0% | 5.9% | 6.5% | 86 Yes | 2,738,852,403.05 | 113,218,826.01 | 1,049,943,508.60 | 63,842,351.18 | 172 Yes | 115 Yes | 103 Yes | 95 Yes | 139 Yes | 139 Yes | 139 Yes | 119 Yes | 103 Yes | 1 Yes | 6 Yes | 4 Yes | 1 Yes | 0 Yes | 0 Yes | 0 Yes | — | |
Showing 0–0 of 0 projects · page 1/1